My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACCO 1 - 2002
Clerk
>
Contracts / Agreements
>
A
>
ACCO 1 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:20:27 PM
Creation date
7/24/2003 2:48:01 PM
Metadata
Fields
Template:
Contracts
Company Name
ACCO (previously Air Conditioning Company, Inc.)
Contract #
A-2002-184
Agency
Police
Council Approval Date
9/16/2002
Expiration Date
10/1/2003
Insurance Exp Date
10/1/2004
Destruction Year
2008
Notes
Amended by A-2003-120
Document Relationships
ACCO 1A - 2003
(Amended By)
Path:
\Contracts / Agreements\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Annual Preventive Maintenance & Inspection Program <br /> for Low Pressure Centrifugals <br /> <br />Operating Season Inspections <br /> <br />The following.inspection items ensure your unit is operating reliably and <br />the cooling season. <br /> <br />1,, . Inspecting chiller and adjusting safety controls <br /> <br />efficiently <br /> <br />2. Checking purge operation <br /> <br />3. Checking operation of controls <br /> <br />4. Checking oil and refrigerant levels <br /> <br />5. Checking operation of lube system <br /> <br />6. Checking the oil return syste.m <br /> <br />7. Checking operation of motor and starter <br /> <br />8. Recording operating conditions <br /> <br />9. Checking log and reviewing chiller and system operation with operator <br /> <br /> 10. Conducting routine maintenance as recommended and required <br /> <br /> 11. Logging and reporting repairs and parts that are required <br /> <br />through <br /> <br />The Annual Equipment Shutdown Inspection and PM <br /> <br />The following tasks are performed once each year during a shutdown period in order to <br />properly evaluate your equipment status and prepare your unit for the next cooling season: <br /> <br />1, Checking the Compressor-Motor Assembly for the following items and performing PM <br /> Tasks as indicated: <br /> <br /> · Recording voltages <br /> <br /> · Meging and recording motor winding resistance <br /> <br /> · Lubricating open motor <br /> <br /> · Checking the alignment on open drive units <br /> <br /> · Checking the coupling <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.