My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING (4) - 2003
Clerk
>
Contracts / Agreements
>
R
>
RBF CONSULTING (4) - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:14:45 PM
Creation date
11/6/2003 3:13:24 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF Consulting
Contract #
A-2003-085
Agency
Public Works
Council Approval Date
5/5/2003
Expiration Date
6/30/2004
Insurance Exp Date
11/30/2008
Destruction Year
2009
Notes
Amends A-2002-046 (which replaced A-98-021)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit •A" <br />Amendment No. 5 <br /> <br />Deliverables shalt include digital fifes formatted in accordance with the original <br />contract, Electronically formatted files can be E-mailed to the Client if requested. It <br />is not anticipated that a complete edited hard copy will be needed for Design. <br />Product: Field Survey Notes <br />Meeting Attendance at two (2) Meetings <br />Electronic Topographic Base Map processed in AutoCAD at a scale of 1:200._ <br />AM5 Task 5.4 Additional Utility Notifications/Consultation <br />Activities: As a result of the extended duration and the landscape expansion of this project it is <br />anticipated that additional communication, consultation and notification with the <br />various utility owners and the City will be necessary as a result of the plan changes. <br />This task will also investigate opportunities to locate visible utilities within the new <br />landscape areas to provide screening of these facilities in order to improve the <br />appearance along this new landscape corridor on Edinger Avenue. This task also <br />includes additional coordination with the BNSF railroad and Edison and preparation <br />of the "Application for Underground Wireline Crossing" to Catellus Management <br />Corporation to provide a sleeve under the existing BNSF spur within Edinger <br />Avenue. The sleeve will be used by Edison to underground the existing overhead <br />Edison facilities. This task will require an additional detail to provide for the sleeve <br />and has been included with the task for the preparation of revised plans for Edinger <br />Avenue. <br />Compile information in a matrix format to include dates of notification, persons/utility <br />notified and. responses from utility. Copies of this information will be provided to the <br />Ciry. Notifications will include: <br />^ Additional Utility Notifications <br />^ Prepare to Relocate Notice (if applicable) <br />^ Notice to Relocate (if applicable) <br />Utilities to be notified will include: <br />• Southern California Edison <br />• Southern California Gas <br />• Pacific Bell Telephone/AT&T <br />• CATV <br />• W ater and Sewer Districts <br />PHASE 2 PLANS, ESTIMATES & SPECIFICATIONS <br />AMS Task 5.5 Revise Title Sheet, Details and Typical Sections <br />The new landscape plans will require revisions to the Title Sheet, Detail Sheet and <br />Typical Section sheets to reflect the new landscape edge conditions. This task also <br />will provide for an additional detail to accommodate the placement of a sleeve under <br />the BNSF railroad spur within Edinger Avenue for Edison's use in undergrounding <br />their overhead facilities at this location. <br />JN 10-034145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.