My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING (4) - 2003
Clerk
>
Contracts / Agreements
>
R
>
RBF CONSULTING (4) - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:14:45 PM
Creation date
11/6/2003 3:13:24 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF Consulting
Contract #
A-2003-085
Agency
Public Works
Council Approval Date
5/5/2003
Expiration Date
6/30/2004
Insurance Exp Date
11/30/2008
Destruction Year
2009
Notes
Amends A-2002-046 (which replaced A-98-021)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•. ~ . <br />Exhibit'A" <br />Amendment No. 5 <br />AM5 Task 5.6 Revise Project Grading and Improvement Plans, Profiles and Design Cross <br />Sections <br />In order to provide plan clarity separate plans will be prepared at a scale of 1:200 <br />showing the improvements and grading for the new landscaping along the southerly <br />side of Edinger Avenue. <br />Activities: Preparation of Final Plans will be based on the approval by the City of Tustin for the <br />Specific Plan Landscape Concept plans prepared as a result of Task 7 "Landscape <br />Concepts". It is our understanding that the new meandering sidewalk will vary in <br />elevation. This will require the preparation of plan and profiles for the meandering <br />sidewalk to ensure the intent of the landscape concepts are incorporated as well as <br />to ensure compliance with ADA criteria. <br />Grading and removals will be shown on the plans as well as improvements to <br />transition to existing private improvements. Joins to private improvements assume <br />that transitions will be made within five feet beyond the landscape setback limits and <br />Consultant will not be required to replace existing facilities except as necessary for <br />safety and to maintain drainage.. This task excludes the design of new drainage <br />facilities, parking lot design, wall design or other private facilities affected bythe new <br />improvements and that the design of these private improvements will be addressed <br />as a result of right-of-way negotiations with the property owners by the City. <br />All plan types will be completed in the City of Santa Ana format in conformance with <br />the original contract. City of Tustin latest applicable design standards will be used <br />for the design of improvements within the City of Tustin. Drafting and plan ' <br />preparation format will be in conformance with City of Santa Ana requirements. <br />AM5 Task 5.7 Landscape & Irrigation Construction Plans <br />Activities: Consultant shall revise the Landscape Construction Drawings previously prepared <br />for segment one of the project. The plans shall be prepared based on the approved <br />Landscape Concept Plan to incbrporate the requirements- of the Specific Plan <br />prepared under a separate task of this proposal for the southerly side of Edinger <br />Avenue. The plans shall include new parkway and irrigation systems. It is <br />anticipated that there will be five irrigation plans and five planting plans. The plans <br />and a preliminary estimate of construction costs will be submitted to the City for <br />review, comment and approval. <br />AMS Task 5.8 Revised Specifications and Bid Documents <br />Activities: Consultant shall amend the Special Provisions portion of the Construction <br />Specifications and Contract Documents suitable for bidding and award of the <br />Contracts to accommodate the new plan revisions. These special provisions shall <br />be incorporated into the Client's standard construction document package. Revised <br />specifications will accommodate the new landscaping. Specifications of the project <br />will conform with the most recent applicable standards and specifications from the <br />following: <br />a. City of Santa Ana <br />b. Standard Specifications for Public W orks Construction (Green Book) <br />c. State of California Standard Specifications and Standard Plans <br />JN 70.034145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.