My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 3810 S. BRISTOL ST.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
01/05/2004
>
75B - 3810 S. BRISTOL ST.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:03:24 PM
Creation date
1/9/2004 4:14:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
1/5/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
feasible. As part of the City's development review <br />process, the proposed project would be required to prepare <br />a geotechnical study to evaluate the geotechnical <br />constraints on the project site and to identify design <br />recommendations to mitigate potential geotechnical <br />constraint impacts. Preparation of the geotechnical report <br />and compliance with design recommendations would reduce <br />potential geotechnical constraint impacts to a level <br />considered less than significant. <br /> <br />Where sewers are not available for the disposal of <br />wastewater is the soil capable of supporting the use <br />of septic tanks or alternative wastewater disposal <br />systems? <br /> <br />No Impact <br /> <br />The project site is located within urban setting where <br />sewer service is available. The proposed project would not <br />require septic tanks or alternative disposal systems. <br /> <br />VII. HAZARDS/HAZARDOUS MATERIALS <br /> <br />A. Create a significant hazard to the public or the <br /> environment through the routine transport, use or <br /> disposal of hazardous materials? <br /> <br />B. Emit hazardous emissions or handle hazardous or acut.ely <br /> hazardous materials, substance or waste within one- <br /> quarter mile of an existing or proposed school? <br /> <br />Less than Significant Impact <br /> <br />The operation of the proposed project would not involve the <br />routine transportation, handling or storage of large <br />quantities of hazardous materials or waste or the emission <br />of hazardous emissions. The long-term operation and <br />construction operations associated with the proposed <br />project could potentially involve the handling of <br />incidental amounts of hazardous materials, such as <br />solvents, oils, and paints. The proposed project would be <br />required to comply with local, state and federal <br />requirements regarding the handling and storage of <br />hazardous materials. Compliance with local, state and <br />federal regulations regarding the handling and storage of <br />hazardous materials would reduce potential hazardous <br /> <br />7 5 Page 104 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.