My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Presentation - Item 17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Presentation - Item 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 7:56:38 PM
Creation date
3/4/2025 7:56:27 PM
Metadata
Fields
Template:
City Clerk
Date
3/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bristol Street Improvements Project -Phase 4 <br />Public Works Agency <br />Item 17 <br />March 04, 2025 <br />Slide 12 <br />FAQs <br />•When will we start seeing construction? <br />–Construction is scheduled to start in April 2025. <br />•When will the project be completed? <br />–The project is scheduled to be finished by November 2026. <br />•What about future improvements? <br />–The Bristol Corridor was split into 5 major phases. Phase 1 & 2 have been <br />completed. Phase 3 (Civic Center to Washington) is under construction. The final <br />segment, Phase 5 of the project (18th to Elm) is not funded and will be revisited in <br />the future. <br />•Who will maintain the empty lots? <br />–During construction the contractor will be responsible for maintaining the lots. <br />–After construction the City will maintain the lots until they are sold or developed as <br />parks.
The URL can be used to link to this page
Your browser does not support the video tag.