Laserfiche WebLink
Bristol Street Improvements Project -Phase 4 <br />Public Works Agency <br />Item 17 <br />March 04, 2025 <br />Slide 12 <br />FAQs <br />•When will we start seeing construction? <br />–Construction is scheduled to start in April 2025. <br />•When will the project be completed? <br />–The project is scheduled to be finished by November 2026. <br />•What about future improvements? <br />–The Bristol Corridor was split into 5 major phases. Phase 1 & 2 have been <br />completed. Phase 3 (Civic Center to Washington) is under construction. The final <br />segment, Phase 5 of the project (18th to Elm) is not funded and will be revisited in <br />the future. <br />•Who will maintain the empty lots? <br />–During construction the contractor will be responsible for maintaining the lots. <br />–After construction the City will maintain the lots until they are sold or developed as <br />parks.