My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Presentation - Item 17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Presentation - Item 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 7:56:38 PM
Creation date
3/4/2025 7:56:27 PM
Metadata
Fields
Template:
City Clerk
Date
3/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bristol Street Improvements Project -Phase 4 <br />Public Works Agency <br />Item 17 <br />March 04, 2025 <br />Slide 13 <br />FAQs <br />•Will traffic be impacted? <br />–Yes, as with any roadway construction, traffic disruptions are inevitable. However, <br />the project is designed to maintain at least two lanes in each direction. Once <br />completed, the roadway will have three lanes in each direction, improving traffic <br />flow. <br />•How are we going to mitigate construction noise? <br />–An 8-foot sound wall will be constructed first to reduce noise. <br />–The contractor must follow designated working hours that restrict loud activities <br />during overnight and early morning hours. <br />•How are we going to mitigate construction dust? <br />–Contractor is required to regularly sweep the street and implement best practices <br />to minimize dust. <br />•Where will the contractor stage their equipment and material? <br />–The contractor will use the existing vacant lots on both sides of Bristol for <br />construction staging. However, there will be designated areas away from <br />residences, for the contractor to maintain their heavy stockpiling and large <br />equipment.
The URL can be used to link to this page
Your browser does not support the video tag.