Laserfiche WebLink
Bristol Street Improvements Project -Phase 4 <br />Public Works Agency <br />Item 17 <br />March 04, 2025 <br />Slide 13 <br />FAQs <br />•Will traffic be impacted? <br />–Yes, as with any roadway construction, traffic disruptions are inevitable. However, <br />the project is designed to maintain at least two lanes in each direction. Once <br />completed, the roadway will have three lanes in each direction, improving traffic <br />flow. <br />•How are we going to mitigate construction noise? <br />–An 8-foot sound wall will be constructed first to reduce noise. <br />–The contractor must follow designated working hours that restrict loud activities <br />during overnight and early morning hours. <br />•How are we going to mitigate construction dust? <br />–Contractor is required to regularly sweep the street and implement best practices <br />to minimize dust. <br />•Where will the contractor stage their equipment and material? <br />–The contractor will use the existing vacant lots on both sides of Bristol for <br />construction staging. However, there will be designated areas away from <br />residences, for the contractor to maintain their heavy stockpiling and large <br />equipment.