Laserfiche WebLink
Bristol Street Improvements Project -Phase 4 <br />Public Works Agency <br />Item 17 <br />March 04, 2025 <br />Slide 5 <br />PROJECT PHASING <br />Phase 1: Sound Walls, Temporary Street Lighting, and <br />Potholing <br />Sound Walls <br />To be constructed on along property lines to <br />protect neighboring residents from construction <br />and future traffic noise <br />Temporary Lighting <br />To ensure safety during construction phase both <br />street lighting and traffic signals will be maintained <br />with temporary fixtures until the project installs the <br />permanent improvements <br />Potholing <br />Exploratory digging will take place throughout the <br />project to verify depths and locations of <br />underground utilities