My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Presentation - Item 17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Presentation - Item 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 7:56:38 PM
Creation date
3/4/2025 7:56:27 PM
Metadata
Fields
Template:
City Clerk
Date
3/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bristol Street Improvements Project -Phase 4 <br />Public Works Agency <br />Item 17 <br />March 04, 2025 <br />Slide 6 <br />PROJECT PHASING <br />Phase 2: Electrical and Communications Undergrounding <br />Ducts and Structures <br />City Contractor will construct all the underground <br />ducts and structures for SCE, AT&T, Charter, <br />Crown Castle, and TCA <br />Cabling <br />Once underground structures are in place, utility <br />companies will pull new cable through them and <br />make all the connections <br />Pole Removal <br />Once the new underground system is in place, <br />utility companies will remove existing cables from <br />the overhead poles and remove the poles
The URL can be used to link to this page
Your browser does not support the video tag.