My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECH 1 -2003
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECH 1 -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:36:44 AM
Creation date
1/23/2004 10:25:00 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Building Technologies, Inc.
Contract #
A-2003-022
Agency
Finance & Management Services
Council Approval Date
2/3/2003
Expiration Date
3/1/2014
Insurance Exp Date
10/1/2008
Destruction Year
2019
Notes
Amended by A-2003-022-01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Use of dedicated fiber optic for inter-connection between buildings and the maintenance <br />office. Siemens to provide fiber optic interface devices. All intra-building connections to be dedicated <br />cable installed by Siemens. <br /> 5. One dial up modem will be included at a controller to allow outside dial up access. <br />Siemens to provide complete set of As-Builts upon completion. <br /> 6. One Laptop with Datamate Base software is included. <br /> <br />Section 2. FACILITY AND OPERATIONAL IMPROVEMENTS: City Hall, Ross Annex <br /> <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br /> <br />Heating, Ventilating and Air Conditioning 0tVAC) equipment: <br /> <br />The Ross Annex building is served by existing (3) Trane packaged air conditioning units. The building <br />is currently controlled through a pneumatic system. <br /> <br /> 1. Existing pneumatic controlled zones shall be maintained. <br /> <br />Heating, Ventilating And Air Conditioning Systems (Hvac) Control System <br /> <br />The existing building control system shall be maintained and interlocked with the new EMS system <br />located in city hall to perform unit monitoring and scheduling. <br /> <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br /> <br />Heating, Ventilating and Air Conditioning Systems (HVAC) Control System <br /> <br />See EMS scope at City Hall. <br /> <br />Section 3. FACILITY AND OPERATIONAL IMPROVEMENTS: City Library <br /> <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br /> <br />Heating, Ventilating and Air Conditioning (HVAC) equipment: <br />The City Library is served by two constant volume multi-zone (MZ) air handling units (AHU). Each <br />AHU unit has single speed fan motor. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.