My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECH 1 -2003
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECH 1 -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:36:44 AM
Creation date
1/23/2004 10:25:00 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Building Technologies, Inc.
Contract #
A-2003-022
Agency
Finance & Management Services
Council Approval Date
2/3/2003
Expiration Date
3/1/2014
Insurance Exp Date
10/1/2008
Destruction Year
2019
Notes
Amended by A-2003-022-01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Use the existing backup air conditioning unit (BUAC) as the primary cooling system of the <br />call center. <br /> 3. The existing AHU serving this space shall be converted as a backup cooling system. <br /> 4. Provide automatic motorized dampers in the existing ductwork as indicated in the attached <br />partial plans. <br /> 5. Upon deactivation of the BUAC, the AHU and dampers indicated in the partial plans shall <br />be energized (during off hours or weekends) <br /> 6. Provide complete operable system. <br /> <br />Section 6. FACILITY AND OPERATIONAL IMPROVEMENTS: Corporate Yard <br /> <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br /> <br />Administration Building: <br /> <br />Heating, Ventilating and Air Conditioning (HVAC) equipment <br /> <br />The Admin building is served by dual duct air handling units (AHU) with separate cooling and heating <br />tans. <br /> 1. Replace the supply fan motors with premium efficiency motors. (AHU-1 has 5-hp motor <br />and AHU-2 has 3-hp motor). <br /> 2. Replace the AHU supply fan motor with new premium efficiency motor. In addition, <br />replace existing belts, pulleys with new cog belt synchronous type belts and sheaves (Goodyear or <br />equal). <br /> 3. The existing lighting and mechanical system time clocks will be removed and the control <br />points will be integrated into the new DDC controller on site. <br /> <br />Water Meter Building: <br /> <br />The building is conditioned by a 5-Ton packaged gas and electric air conditioning unit. Maintain the <br />trait in the roof. <br /> 1. The existing lighting and mechanical system time clocks will be removed and the control <br />points will be integrated into the new DDC controller on site. <br /> <br />Fleet Building: <br /> <br />There are three packaged gas and electric air conditioning units serving the building. AC-1 is 10-Tons <br />while AC-2 & 3 are 5-Tons. Maintain the units in the roof. <br /> 1. The existing lighting and mechanical system time clocks will be removed and the control <br />points will be integrated into the new DDC controller on site. <br /> <br />6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.