My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECH 1 -2003
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECH 1 -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:36:44 AM
Creation date
1/23/2004 10:25:00 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Building Technologies, Inc.
Contract #
A-2003-022
Agency
Finance & Management Services
Council Approval Date
2/3/2003
Expiration Date
3/1/2014
Insurance Exp Date
10/1/2008
Destruction Year
2019
Notes
Amended by A-2003-022-01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Warehouse Building: <br /> <br />There are two packaged gas and electric air conditioning units serving the building. AC-1 is 10-Tons <br />and AC-2 is 7 V2 -Tons. Maintain the units in the roof. <br /> <br /> 1. The existing lighting and mechanical system time clocks will be removed and the control <br />points will be integrated into the new DDC controller on site. <br /> <br />Heating, Ventilating and Air Conditioning Systems (HVAC) Control System <br /> <br />Provide EMS in the Corporate Yard facilities and interface with the new EMS at the City Hall. <br /> <br />See EMS scope at City Hall. <br /> <br />Section 7. FACILITY AND OPERATIONAL IMPROVEMENTS: Corbin Center <br /> <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br />Heating, Ventilating and Air Conditioning (HVAC) equipment <br /> <br />Replace two existing 5-Ton and 4-Ton gas and electric air conditioning units. Unit shall include both <br />the forced air unit (FAU) and the condensing unit (CU). Condensing unit is located in the roof. <br />Heating, Ventilating And Air Conditioning Systems (Hvac) Control System <br /> <br />Section 8. FACILITY AND OPERATIONAL IMPROVEMENTS: Senior Citizen Center <br /> <br />Lighting <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br /> <br />Heating, Ventilating and Air Conditioning (HVAC) equipment <br /> <br /> 1. Replace existing 30-Ton multi-zone (MZ) packaged air handling unit in the roof. Use <br /> equipment with lightweight materials. (Seasons 4 or Octagon VAV unit) <br /> 2. Re-use the existing ducting as much as possible providing new insulation for the existing <br /> ductwork as needed. <br /> 3. Provide all ducting, electrical, condensate piping and roof curb. <br /> 4. Perform structural calculations for the roof to carry new equipment load. <br /> 5. Provide new thermostats. <br /> <br />Section 9. FACILITY AND OPERATIONAL IMPROVEMENTS: Jerome Center <br /> <br />Lighting <br /> <br />See Exhibit F2 for attached room by room lighting spreadsheets for the exact scope of work. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.