My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECH 1 -2003
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECH 1 -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:36:44 AM
Creation date
1/23/2004 10:25:00 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Building Technologies, Inc.
Contract #
A-2003-022
Agency
Finance & Management Services
Council Approval Date
2/3/2003
Expiration Date
3/1/2014
Insurance Exp Date
10/1/2008
Destruction Year
2019
Notes
Amended by A-2003-022-01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 to Exhibit A <br /> Special Provisions <br />Energy Management Projects <br /> <br />The Scope of Work related to this Attachment is described in Exhibit A- Scope of <br />Services and includes: <br /> <br />Relamping of City Hall, Ross Annex, Main Library, Corporation Yard, New Hope <br />Library, part of Corbin Center, South West center, SA Senior Center, Police <br />Administration, Police Holding Facility, Police Shooting Range. <br /> <br />Modification of the City Hall HVAC system from fixed dual duct volume to variable <br />Dual Duct system with digital controls for the City Hall as specified in Attachment D <br />to Attachment 1 to Exhibit A <br /> <br />Connect City Hall, Main Library, Corporation Yard, and Ross Annex to a main <br />computer equipped with energy management software and digital controls as <br />specified in Attachment E to Attachment 1 to Exhibit A <br /> <br />· Modification of HVAC systems at Corbin Center. <br /> <br />· Modification of HVAC at Corporation Yard. <br /> <br />· Replacement & modification of HVAC at New Hope Library. <br /> <br />· Window replacement at Main Library. <br /> <br />· Refurbishment's of elevators at City Hall as described in Attachment A and B to <br /> Attachment I to Exhibit A <br /> <br />· Modification of the 911 HVAC system at the Police Facility. <br /> <br />· Installation of a Variable Frequency Drive to York Centrifugal Chiller at the Police <br /> Facility as described in Attachment C to Attachment 1 to Exhibit A <br /> <br />1.01 Project Sequence: <br /> <br />· Pool cover at Salgado Recreation Center. <br />· Lighting refurbishment. <br />· FIM at City Hall. <br />· Elevators upgrades. <br />· FIM Main Library. <br />· Variable frequency drive at Police Facility. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.