Laserfiche WebLink
Provide a standby power unit and a means for starting it that wil! deliver su~cient power to <br />the elevator disconnect switches to operate one or more elevators at a time at full-rated <br />speed. Provide a ~ansfer switch for each feeder for switching from normal power to <br />slandby (emergency) power and a contact on each transfer switch closed on normal power <br />supply with two vires ti'om this contact to one elevator cont:mller. Provide a means for <br />absorbing power regenerated by the elevator system when nmniag with overhauling loads <br />such as full load down. <br /> <br />Any modification or installation of ligh~ an~or electrical outleB in the machine room <br />and/or pit to be performed by others. <br /> <br />MAINTENANCE <br /> <br />A One (1) year warranty maintenance period will commence on the date of substantial <br />completion of the elevator machine and controller izshallation. For the purpose of <br />clarity, Substantial Completion shall be considered to be *.he same day the Owner has signed <br />ThyssenKmpp Elevator Corporation's final acceptance form and takes posession o£the <br />elevators for their use. <br /> <br />20% Upon signing contract <br />20% Upon delivery of material to jobsite <br />20% Upon acceptance of 1s~ elevator <br />15% Upon acceptance of 2na elevator <br />15% Upon acceplance of 3~. elevator <br />10% Upon f'mal inspection and acceptance. <br /> <br />Page 11 <br /> <br /> <br />