My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECH 1 -2003
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECH 1 -2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:36:44 AM
Creation date
1/23/2004 10:25:00 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Building Technologies, Inc.
Contract #
A-2003-022
Agency
Finance & Management Services
Council Approval Date
2/3/2003
Expiration Date
3/1/2014
Insurance Exp Date
10/1/2008
Destruction Year
2019
Notes
Amended by A-2003-022-01
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Provide a standby power unit and a means for starting it that wil! deliver su~cient power to <br />the elevator disconnect switches to operate one or more elevators at a time at full-rated <br />speed. Provide a ~ansfer switch for each feeder for switching from normal power to <br />slandby (emergency) power and a contact on each transfer switch closed on normal power <br />supply with two vires ti'om this contact to one elevator cont:mller. Provide a means for <br />absorbing power regenerated by the elevator system when nmniag with overhauling loads <br />such as full load down. <br /> <br />Any modification or installation of ligh~ an~or electrical outleB in the machine room <br />and/or pit to be performed by others. <br /> <br />MAINTENANCE <br /> <br />A One (1) year warranty maintenance period will commence on the date of substantial <br />completion of the elevator machine and controller izshallation. For the purpose of <br />clarity, Substantial Completion shall be considered to be *.he same day the Owner has signed <br />ThyssenKmpp Elevator Corporation's final acceptance form and takes posession o£the <br />elevators for their use. <br /> <br />20% Upon signing contract <br />20% Upon delivery of material to jobsite <br />20% Upon acceptance of 1s~ elevator <br />15% Upon acceptance of 2na elevator <br />15% Upon acceplance of 3~. elevator <br />10% Upon f'mal inspection and acceptance. <br /> <br />Page 11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.