Laserfiche WebLink
<br />B. <br /> <br />Exceed, either individually or cumulatively, a level of <br />service standard established by the county congestion <br />management agency for designated roads or highways? <br /> <br />D. <br /> <br />Substantially increase hazards to a design feature <br /> <br />E. <br /> <br />Result in inadequate emergency access <br /> <br />F. <br /> <br />Result in inadequate parking capacity <br /> <br />G. <br /> <br />Conflict with adopted policies supporting alternative <br />transportation <br /> <br />No Impact <br /> <br />The City of Santa Ana circulation system consists of a series of <br />local streets, arterials and major regional highways. A <br />significant impact to the circulation system would occur when <br />the traffic generated from a project reduces the level of <br />service of a roadway or intersection to a level considered not <br />acceptable, results in pedestrian safety hazards, inadequate <br />emergency access and inadequate parking facilities. Approval of <br />the proposed project would not directly result in additional <br />amounts of traffic on the City's circulation system or result <br />increased demands for parking facilities. In accordance with the <br />revised procedures and amended Circulation Element, future <br />neighborhood traffic plans would be evaluated for potential <br />traffic, circulation, emergency access and parking impacts. <br /> <br />C. <br /> <br />Result in a change in <br />either an increase in <br />location that results <br /> <br />air traffic patterns, including <br />traffic levels or a change in <br />in substantial safety risks? <br /> <br />No Impact <br /> <br />The City of Santa Ana is located approximately one mile <br />northwest of John Wayne Airport and is included in the Planning <br />Area of the Orange County Airport Land Use Commission Airport <br />Environs Land Use Plan for John Wayne Airport. According to the <br />Environs Land Use plan for John Wayne Airport, there are no <br />accident potential zones in Santa Ana. Approval of the proposed <br />project would not result in any activities that be in conflict <br />with the Environs Land Use plan for John Wayne Airport or would <br />result in any changes in air traffic patterns that would <br />increase safety risks in the City. <br /> <br />20 <br /> <br />~SF238 <br />