Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-6600 <br />BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />Remove and Replace Water Valve Frame <br />1 <br />EA <br />$ 3,000 <br />$ 3,000 <br />and Cover. Adjust to Grade. <br />15 <br />Install 8" Dual Wall HDPE Pipe <br />$ <br />$ <br />Including Trenching, Removal, Bedding, <br />190 <br />LF <br />300 <br />57,000 <br />and Backfill (Mod C.S.A. STD PLAN <br />1150) <br />16 <br />Install 4" Dual Wall HDPE Pipe <br />$ <br />$ <br />Including Trenching, Removal, Bedding, <br />55 <br />LF <br />220 <br />and Backfill (Mod C.S.A. STD PLAN <br />12,100 <br />1150) <br />17 <br />Install Hydrodynamic Separator <br />$ <br />$ <br />Including Excavation, Removal, and <br />1 <br />EA <br />75,000 <br />75,000 <br />Backfill <br />18 <br />Construct 16"xl6" Curbside Grating <br />$ <br />$ <br />Catch Basin with Insert Filter and No <br />2 <br />EA <br />8,500 <br />17,000 <br />Dumping Stencil Incl. Excavation, <br />Removals, and Backfill <br />19 <br />Construct 24"x24" Junction Box with <br />$ <br />$ <br />Orifice Plate Incl. Excavation, Removals, <br />2 <br />EA <br />11,500 <br />23,000 <br />and Backfill <br />20 <br />Construct 7.5' Long Slot Drain with No <br />$ <br />$ <br />Dumping Stencil and Including 4' Lateral <br />1 <br />LS <br />23,000 <br />23,000 <br />Connection to Structure <br />21 <br />Construct Low Flow Diversion Culvert <br />$ 220 <br />$ 26,400 <br />120 <br />SF <br />22 <br />Install Underground Stormwater Cistern <br />$ <br />$ <br />Including Risers, Collars, Manifold <br />1 <br />LS <br />160,000 <br />160,000 <br />Piping, Excavation, Shoring, Removals, <br />Bedding, Geotextiles, and Backfill <br />23 <br />Install Underground Storage Cistern <br />$ <br />$ <br />Pump, Mechanical Skid, Appurtenances, <br />1 <br />LS <br />140,000 <br />140,000 <br />and Concrete Pad <br />24 <br />Construct 2" Sch 80 PVC Pipe (Cistern <br />$ <br />$ <br />Pump to Skid) Incl. Trenching, <br />45 <br />LF <br />270 <br />12,150 <br />Removals, Bedding, and Backfill <br />25 <br />Construct 4" Sch 80 PVC Pipe (Skid to <br />$ 200 <br />$ 13,000 <br />Basin) Incl. Trenching, Removals, <br />65 <br />LF <br />Bedding, and Backfill <br />26 <br />$ <br />$ <br />Install 2" Isolation Valve in Valve Box <br />2 <br />EA <br />3,500 <br />7,000 <br />27 <br />Construct Bioretention Basin with <br />$ <br />$ <br />Underdrains Including Excavation, <br />95,000 <br />95,000 <br />Geotextiles, Removals, Underdrains, <br />1 <br />LS <br />Cleanouts, Soil, Stone, and Riprap Inlet <br />Protection <br />28 <br />Construct 24"x24" Grated Catch Basin <br />$ 8,500 <br />$ 8,500 <br />with Inlet Filter and No Dumping Stencil <br />1 <br />EA <br />29 <br />Install Submersible Pumps, Duplex <br />$ <br />$ <br />Control Panel with Enclosure, Precast <br />1 <br />LS <br />95,000 <br />95,000 <br />Manhole, Vent, and Appurtenances Incl. <br />P-2 of P-23 <br />