CITY OF SANTA ANA
<br />PROPOSAL
<br />PROJECT NO.: 24-6600
<br />BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT
<br />Item
<br />Description
<br />Qty
<br />Unit
<br />Unit Price
<br />Amount
<br />14
<br />Remove and Replace Water Valve Frame
<br />1
<br />EA
<br />$ 3,000
<br />$ 3,000
<br />and Cover. Adjust to Grade.
<br />15
<br />Install 8" Dual Wall HDPE Pipe
<br />$
<br />$
<br />Including Trenching, Removal, Bedding,
<br />190
<br />LF
<br />300
<br />57,000
<br />and Backfill (Mod C.S.A. STD PLAN
<br />1150)
<br />16
<br />Install 4" Dual Wall HDPE Pipe
<br />$
<br />$
<br />Including Trenching, Removal, Bedding,
<br />55
<br />LF
<br />220
<br />and Backfill (Mod C.S.A. STD PLAN
<br />12,100
<br />1150)
<br />17
<br />Install Hydrodynamic Separator
<br />$
<br />$
<br />Including Excavation, Removal, and
<br />1
<br />EA
<br />75,000
<br />75,000
<br />Backfill
<br />18
<br />Construct 16"xl6" Curbside Grating
<br />$
<br />$
<br />Catch Basin with Insert Filter and No
<br />2
<br />EA
<br />8,500
<br />17,000
<br />Dumping Stencil Incl. Excavation,
<br />Removals, and Backfill
<br />19
<br />Construct 24"x24" Junction Box with
<br />$
<br />$
<br />Orifice Plate Incl. Excavation, Removals,
<br />2
<br />EA
<br />11,500
<br />23,000
<br />and Backfill
<br />20
<br />Construct 7.5' Long Slot Drain with No
<br />$
<br />$
<br />Dumping Stencil and Including 4' Lateral
<br />1
<br />LS
<br />23,000
<br />23,000
<br />Connection to Structure
<br />21
<br />Construct Low Flow Diversion Culvert
<br />$ 220
<br />$ 26,400
<br />120
<br />SF
<br />22
<br />Install Underground Stormwater Cistern
<br />$
<br />$
<br />Including Risers, Collars, Manifold
<br />1
<br />LS
<br />160,000
<br />160,000
<br />Piping, Excavation, Shoring, Removals,
<br />Bedding, Geotextiles, and Backfill
<br />23
<br />Install Underground Storage Cistern
<br />$
<br />$
<br />Pump, Mechanical Skid, Appurtenances,
<br />1
<br />LS
<br />140,000
<br />140,000
<br />and Concrete Pad
<br />24
<br />Construct 2" Sch 80 PVC Pipe (Cistern
<br />$
<br />$
<br />Pump to Skid) Incl. Trenching,
<br />45
<br />LF
<br />270
<br />12,150
<br />Removals, Bedding, and Backfill
<br />25
<br />Construct 4" Sch 80 PVC Pipe (Skid to
<br />$ 200
<br />$ 13,000
<br />Basin) Incl. Trenching, Removals,
<br />65
<br />LF
<br />Bedding, and Backfill
<br />26
<br />$
<br />$
<br />Install 2" Isolation Valve in Valve Box
<br />2
<br />EA
<br />3,500
<br />7,000
<br />27
<br />Construct Bioretention Basin with
<br />$
<br />$
<br />Underdrains Including Excavation,
<br />95,000
<br />95,000
<br />Geotextiles, Removals, Underdrains,
<br />1
<br />LS
<br />Cleanouts, Soil, Stone, and Riprap Inlet
<br />Protection
<br />28
<br />Construct 24"x24" Grated Catch Basin
<br />$ 8,500
<br />$ 8,500
<br />with Inlet Filter and No Dumping Stencil
<br />1
<br />EA
<br />29
<br />Install Submersible Pumps, Duplex
<br />$
<br />$
<br />Control Panel with Enclosure, Precast
<br />1
<br />LS
<br />95,000
<br />95,000
<br />Manhole, Vent, and Appurtenances Incl.
<br />P-2 of P-23