CITY OF SANTA ANA
<br />PROPOSAL
<br />PROJECT NO.: 24-6600
<br />BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT
<br />Item
<br />Description
<br />Qty
<br />Unit
<br />Unit Price
<br />Amount
<br />Excavation, Removals, Bedding, and
<br />Backfill
<br />30
<br />Construct 3" Sch 80 PVC Pipe (Pump
<br />$
<br />$
<br />Manhole to Curb) Incl. Trenching,
<br />80
<br />LF
<br />160
<br />12,800
<br />Removals, Bedding, and Backfill
<br />31
<br />Install 6" Perforated Single Wall HDPE
<br />$
<br />$
<br />Pipe Incl. Filter Sock, Drainage Stone,
<br />145
<br />LF
<br />110
<br />15,950
<br />and Non -Woven Geotextile
<br />32
<br />Install Shallow 6" Dual Wall HDPE Pipe
<br />$
<br />$
<br />Incl. Trenching, Removals, Bedding, and
<br />400
<br />LF
<br />200
<br />80,000
<br />Backfill (Detail E, Sheet DD-06)
<br />33
<br />Install Shallow 8" Dual Wall HDPE Pipe
<br />$
<br />$
<br />Incl. Trenching, Removals, Bedding, and
<br />60
<br />LF
<br />300
<br />18,000
<br />Backfill Detail E, Sheet DD-06
<br />34
<br />Install Shallow 12" Dual Wall HDPE
<br />$
<br />$
<br />Pipe Incl. Trenching, Removals,
<br />420
<br />LF
<br />180
<br />75,600
<br />Bedding, and Backfill (Detail E, Sheet
<br />DD-06
<br />35
<br />Install Underdrain Cleanout in Paved
<br />$
<br />$
<br />Area Including Cast Iron Frame and
<br />9
<br />EA
<br />2,500
<br />22,500
<br />Cover
<br />36
<br />Install 1" Water Service (Water Main
<br />$
<br />$ 18,000
<br />Point of Connection to Meter)
<br />1
<br />LS
<br />18,000
<br />37
<br />Install 2" Water Service (Water Main
<br />1
<br />LS
<br />$ 22,000
<br />$ 22,000
<br />Point of Connection to Meter)
<br />38
<br />Construct 1" Sch 80 PVC Water Line
<br />$
<br />$
<br />Including Trenching, Removals,
<br />415
<br />LF
<br />75
<br />31,125
<br />Bedding, and Backfill
<br />39
<br />Construct 2" Sch 80 PVC Water Line
<br />$
<br />$
<br />Including Trenching, Removals,
<br />115
<br />LF
<br />95
<br />10,925
<br />Bedding, and Backfill
<br />40
<br />Install 1" Pressure Reducing Valve in
<br />$
<br />$
<br />Vault
<br />1
<br />EA
<br />5,000
<br />5,000
<br />41
<br />Install Make-up Water Trough Valve
<br />1
<br />EA
<br />$ 12,000
<br />$ 12,000
<br />42
<br />Install 2" Backflow Prevention Assembly
<br />1
<br />EA
<br />$
<br />10,000
<br />$
<br />10,000
<br />with Enclosure
<br />43
<br />Construct 12"X12" Catch Basin with
<br />$
<br />$
<br />Atrium Grate (NDS or Approved Equal).
<br />13
<br />EA
<br />3,000
<br />39,000
<br />Incl. Excavation, Removals, Backfill,
<br />and Risers
<br />44
<br />Construct Venting Catch Basin and
<br />$
<br />$
<br />Piping Incl. Trenching, Removals,
<br />1
<br />LS
<br />40,000
<br />40,000
<br />Bedding, and Backfill
<br />45
<br />Install Drinking Fountain, 3/4" Service
<br />$
<br />$
<br />Lateral with Valve, and Drainage Sump
<br />2
<br />EA
<br />12,500
<br />25,000
<br />with Access Box and Overflow Piping
<br />46
<br />Construct Asphalt Concrete Pavement
<br />$
<br />$
<br />485
<br />SF
<br />15
<br />7,275
<br />P-3 of P-23
<br />
|