Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-6600 <br />BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />Excavation, Removals, Bedding, and <br />Backfill <br />30 <br />Construct 3" Sch 80 PVC Pipe (Pump <br />$ <br />$ <br />Manhole to Curb) Incl. Trenching, <br />80 <br />LF <br />160 <br />12,800 <br />Removals, Bedding, and Backfill <br />31 <br />Install 6" Perforated Single Wall HDPE <br />$ <br />$ <br />Pipe Incl. Filter Sock, Drainage Stone, <br />145 <br />LF <br />110 <br />15,950 <br />and Non -Woven Geotextile <br />32 <br />Install Shallow 6" Dual Wall HDPE Pipe <br />$ <br />$ <br />Incl. Trenching, Removals, Bedding, and <br />400 <br />LF <br />200 <br />80,000 <br />Backfill (Detail E, Sheet DD-06) <br />33 <br />Install Shallow 8" Dual Wall HDPE Pipe <br />$ <br />$ <br />Incl. Trenching, Removals, Bedding, and <br />60 <br />LF <br />300 <br />18,000 <br />Backfill Detail E, Sheet DD-06 <br />34 <br />Install Shallow 12" Dual Wall HDPE <br />$ <br />$ <br />Pipe Incl. Trenching, Removals, <br />420 <br />LF <br />180 <br />75,600 <br />Bedding, and Backfill (Detail E, Sheet <br />DD-06 <br />35 <br />Install Underdrain Cleanout in Paved <br />$ <br />$ <br />Area Including Cast Iron Frame and <br />9 <br />EA <br />2,500 <br />22,500 <br />Cover <br />36 <br />Install 1" Water Service (Water Main <br />$ <br />$ 18,000 <br />Point of Connection to Meter) <br />1 <br />LS <br />18,000 <br />37 <br />Install 2" Water Service (Water Main <br />1 <br />LS <br />$ 22,000 <br />$ 22,000 <br />Point of Connection to Meter) <br />38 <br />Construct 1" Sch 80 PVC Water Line <br />$ <br />$ <br />Including Trenching, Removals, <br />415 <br />LF <br />75 <br />31,125 <br />Bedding, and Backfill <br />39 <br />Construct 2" Sch 80 PVC Water Line <br />$ <br />$ <br />Including Trenching, Removals, <br />115 <br />LF <br />95 <br />10,925 <br />Bedding, and Backfill <br />40 <br />Install 1" Pressure Reducing Valve in <br />$ <br />$ <br />Vault <br />1 <br />EA <br />5,000 <br />5,000 <br />41 <br />Install Make-up Water Trough Valve <br />1 <br />EA <br />$ 12,000 <br />$ 12,000 <br />42 <br />Install 2" Backflow Prevention Assembly <br />1 <br />EA <br />$ <br />10,000 <br />$ <br />10,000 <br />with Enclosure <br />43 <br />Construct 12"X12" Catch Basin with <br />$ <br />$ <br />Atrium Grate (NDS or Approved Equal). <br />13 <br />EA <br />3,000 <br />39,000 <br />Incl. Excavation, Removals, Backfill, <br />and Risers <br />44 <br />Construct Venting Catch Basin and <br />$ <br />$ <br />Piping Incl. Trenching, Removals, <br />1 <br />LS <br />40,000 <br />40,000 <br />Bedding, and Backfill <br />45 <br />Install Drinking Fountain, 3/4" Service <br />$ <br />$ <br />Lateral with Valve, and Drainage Sump <br />2 <br />EA <br />12,500 <br />25,000 <br />with Access Box and Overflow Piping <br />46 <br />Construct Asphalt Concrete Pavement <br />$ <br />$ <br />485 <br />SF <br />15 <br />7,275 <br />P-3 of P-23 <br />