My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 09 - Bristol-Tolliver Street Urban Green Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/18/2025
>
Item 09 - Bristol-Tolliver Street Urban Green Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 5:39:07 PM
Creation date
3/13/2025 8:05:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
9
Date
3/18/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-6600 <br />BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />83 <br />As -Built Plans <br />$5,000 <br />$5,000 <br />1 <br />LS <br />Bid Alternates <br />1 <br />Construct Skate Park Elements and <br />$ <br />$ <br />Paving <br />1 <br />LS <br />545,000 <br />545,000 <br />2 <br />Construct 4" Thick Asphalt Concrete <br />$ <br />$ <br />Basketball Court Including Striping, <br />Colored Surface, and Perimeter Edging. <br />1 <br />LS <br />235,000 <br />235,000 <br />Includes Basketball Hoop and <br />Foundation <br />TOTAL BASE BID <br />$ <br />3,808,800.00 <br />TOTAL ADD ALTERNATE BID <br />$ <br />780,000.00 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />T This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within one hundred and sixty (160) working days after the commencement date stated in <br />the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place <br />order for long -lead time items (i.e. precast structures, electrical equipment, light poles, playground <br />and fitness equipment, shade structures, fabricated equipment). Work shall be completed by <br />January 31, 2026. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $5,200 per calendar day. <br />P-6 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.