Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-6600 <br />BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />67 <br />Install Picnic Table <br />4 <br />EA <br />$ 4 500 <br />$ 18 000 <br />> <br />68 <br />Install Waste Receptacles (Includes <br />$ <br />$ <br />Trash and Recycle; Furnished by City; <br />5 <br />EA <br />1,000 <br />5,000 <br />Install Only) <br />69 <br />Construct Playground Equipment and <br />$ <br />$ <br />Shade Structure <br />1 <br />LS <br />265,000 <br />265,000 <br />70 <br />Construct Workout Equipment and <br />$ <br />$ <br />Shade Structure <br />1 <br />LS <br />75,000 <br />75,000 <br />71 <br />Install Architectural Fencing <br />$ <br />$ <br />488 <br />LF <br />285 <br />139,080 <br />72 <br />Electrical Trenching Incl. Bedding and <br />$ <br />$ <br />Backfill <br />I <br />LS <br />75,000 <br />75,000 <br />73 <br />Install Electrical Conduit, Wiring, and <br />$ <br />$ <br />Pullboxes <br />1 <br />LS <br />85,000 <br />85,000 <br />74 <br />Install 200A NEMA 3R Meter Pedestal, <br />$ <br />$ <br />Lighting Control Panel in NEMA 3R <br />Enclosure, NEMA 3R Enclosure for <br />I <br />LS <br />35,000 <br />35,000 <br />Security Camera System, and Concrete <br />Pad <br />75 <br />Install 14' Light Pole (includes post, <br />$ <br />$ <br />footing, luminaire, excavation, and <br />14 <br />EA <br />12,000 <br />168,000 <br />removals <br />76 <br />Install 30' Camera Pole (includes post, <br />$ <br />$ <br />footing, luminaire, cameras, excavation, <br />2 <br />EA <br />20,000 <br />40,000 <br />and removals <br />77 <br />Install 30' Sports Lighting Pole (includes <br />$ <br />$ <br />post, footing, luminaires, excavation, and <br />2 <br />EA <br />19,000 <br />38,000 <br />removals <br />78 <br />Install Security Camera System <br />$ <br />$ <br />Infrastructure Including Deferred System <br />I <br />LS <br />55,000 <br />55,000 <br />Design by Contractor <br />79 <br />Install Landscaping Including Turf, <br />$ <br />$ <br />Trees, Shrubs, Mulch, Soil Conditioning, <br />Topsoil, Amendments, Fertilizers, <br />I <br />LS <br />85,000 <br />85,000 <br />Agronomic Testing, Supports, and Root <br />Barriers <br />80 <br />Install Landscape Boulders <br />$ <br />$ 6,650 <br />19 <br />EA <br />350 <br />81 <br />Install Irrigation System Including <br />$ <br />$ <br />Piping, Tubing, Sleeves, Bubblers, <br />Control Wiring, Valve Boxes, <br />1 <br />LS <br />195,000 <br />195,000 <br />Controllers, Valves, Sensors, Quick <br />Couplers, Drip Rings, Etc. <br />82 <br />Plant Establishment (90 Days) <br />$ <br />$ <br />1 <br />LS <br />5,000 <br />5,000 <br />P-5 of P-23 <br />