My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
02/22/2005
>
FULL PACKET_2005-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2015 10:25:28 AM
Creation date
2/16/2005 1:43:47 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Place <br />Focused Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />G-2 Prior to the issuance of grading permits, the proposed project shall submit a site specific <br />geotechnical report that addresses and identifies the seismic constraints on the project <br />site, building loads and design recommendations to reduce potential seismic impacts to a <br />level less than significant. <br /> <br />Level of Significance of Impacts Related to Seismic Shaking Impacts <br /> <br />The adverse impacts of the City Place project related to parks and recreation facilities will be <br />mitigated to below a level of significance based on implementation of mitigation measure G-2. <br /> <br />Findings Related to Geologic Stability Impacts <br /> <br />Changes, or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the ElR. <br /> <br />Facts in Support ofthe Finding Related to Geologic Stability Impacts <br /> <br />As discussed in Section 3,7 of the EIR, the City Place project site is subject to geologic <br />constraints that could impact the geotechnical stability of the project. The implementation of <br />mitigation measure G-l would reduce potential impacts to a level that is below significant. <br /> <br />G-l Prior to the issuance of grading permits, the proposed project shall submit a site specific <br />geotechnical report that addresses and identifies soil constraints on the project site, <br />building loads and design recommendations to ensure the geologic stability ofthe project. <br /> <br />Level of Significance ofImpacts Related to Geologic Stability Impacts <br /> <br />The adverse impacts of the City Place project related to geologic stability will be mitigated to <br />below a level of significance based on implementation of mitigation measure G-l, <br /> <br />4.3 IMPACTS FOUND ADVERSE, BUT NOT SIGNIFICANT AND PROJECT <br />ENHANCEMENT MEASURES TO MINIMIZE IMPACTS <br /> <br />Potentially adverse, but not significant impacts are identified in this section, Project enhancement <br />measures are identified to minimize adverse impacts associated with implementation of the City <br />Place project. <br /> <br />4.3,1 Impacts Related to Construction Noise <br /> <br />Findings Related to Construction Noise <br /> <br />Project enhancement measures have been required in, or incorporated into, the project which <br />lessen construction related impacts as identified in the EIR. <br /> <br />Facts in Support of the Finding Related to Construction Noise <br /> <br />U: IDBottlwp51 I City Place findings. doc <br />September 29, 2004 <br /> <br />Page 18 <br /> <br />75A-140 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.