My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
02/22/2005
>
FULL PACKET_2005-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2015 10:25:28 AM
Creation date
2/16/2005 1:43:47 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Place <br />Focused Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />The adverse impacts of the City Place project related to impacts at the intersection of Memory <br />Lane and Lawson Way will be mitigated to below a level of significance based on <br />implementation of mitigation measure T-5, <br /> <br />4.2,5 Impacts Related to Public Services <br /> <br />Findings Related to Impacts on ParksIRecreation Facilities <br /> <br />Changes, or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the EIR. <br /> <br />Facts in Support of the Finding Related to Impacts on ParksIRecreation Facilities <br /> <br />As discussed in Section 4.8 of the EIR, implementation of the City Place project would increase <br />the demand for parks and recreation facilities and would further the open space/population ratio <br />imbalance in the City, The implementation of mitigation measures P-3 and P-4 would reduce <br />potential impacts to a level that is below significant. <br /> <br />P-3 Prior to the issuance of certificate of the first occupancy permit, the proposed project <br />shall comply with the City's public parkland dedication requirements through provision <br />of private open space, land dedication, fees or other vehicles acceptable to the City. <br /> <br />P-4 Prior to the issuance of the first certificate of occupancy permit, the applicant shall fully <br />pay to install a signalized pedestrian mid-block crossing on Memory Lane from the City <br />Place project to Santiago Park. <br /> <br />Level of Significance of Impacts Related to Parks and Recreation Facilities <br /> <br />The adverse impacts of the City Place project related to parks and recreation facilities will be <br />mitigated to below a level of significance based on implementation of measures P-3 and P-4. <br /> <br />4.2,6 Impacts Related to Geology <br /> <br />Findings Related to Seismic Shaking Impacts <br /> <br />Changes, or alterations have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant environmental effect as identified in the EIR. <br /> <br />Facts in Support ofthe Finding Related to Seismic Shaking Impacts <br /> <br />As discussed in Section 3,7 of the EIR, the City Place project could be subject seismic shaking <br />impacts in the event an earthquake occurs within the vicinity of the project site, The <br />implementation of mitigation measure G-2 would reduce potential impacts to a level that is <br />below significant. <br /> <br />U: \DBottlwp51 I City Place findings. doc <br />September 29, 2004 <br /> <br />Page 17 <br /> <br />75A-139 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.