My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
02/22/2005
>
FULL PACKET_2005-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2015 10:25:28 AM
Creation date
2/16/2005 1:43:47 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Spacing: 30' on center. <br /> <br />(c) Parking Lot Tree: Brachychiton populneus Bottle Tree. <br /> <br />Size: 24" Box. <br /> <br />Spacing: One tree every four to five parking lot spaces. <br /> <br />(d) Landscaped Berm: Hypericum calycinum Aaron's Beard. <br /> <br />Size: Flats. <br />Spacing: 8" on center, triangular spaced. <br /> <br />Note: Architectural berm (less than 3') to screen any <br />interim parking. <br /> <br />(e) Front yard Tree: Bauhinia variegata Purple Orchard Tree. <br /> <br />Size: 24" Box. <br />Spacing: IS' on center. <br /> <br />(n Groundcover: Myaporum parvafolium Drought tolerant <br />'lariety. <br /> <br />Size: Flats. <br />Spacing: 12" on center, triangular spaced. <br /> <br />(G) Turf: Marathon Fescue II Fescue blend. <br />Size: Sodded. <br /> <br />The landscape treatment for de'lelopment categories 3 to 9 <br />.......ill be the same application for Phase I and Phase II. <br /> <br />2a. Owens Dri','e Phase II <br /> <br />The Owens Drive streetscape area will be landscaped with 15 feet <br />of turf adjacent to the curb (five feet inside ofthe property line) <br />and an additional 11 feet of accent paving adjacent to reta.il <br />building frontage. Traditional full width side\valks are required in <br />all areas not adjacent to retail area. Turf and groundcover areas <br />expand significantly at the residential area. Easy pedestrian access <br />is pro','ided along the street, and buffered from adj acent vehicles. <br />Service entrances and utilities are screened from view with buffer <br />planting, per the approved site plan. The street setback of the <br />project along Ov,'ens Drive adjacent to Santiago Park shall be <br /> <br />35 <br /> <br />75A-375 <br />
The URL can be used to link to this page
Your browser does not support the video tag.