My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />PE io. <br /> <br />Preliminary Engineering of Traction Electrification System <br /> <br />It is the purpose of this work task to prepare 30% drawings and specifications for the traction <br />power and power distribution system and to develop detailed recommendations on cOITosion <br />contro \. <br /> <br />CONSULTANT will review all related work in Conceptual Engineering and perform <br />investigations to determine the locations of all potential primary power sources along the <br />CenterLine project. The CONSULTANT will develop a prototypical floor plan and equipment <br />list for the traction power substations and work with those performing the architectural design of <br />a standard substation, Using the recommended location of the traction power substations from <br />the earlier study and working with the station designers and The AUTHORITY staff, the <br />CONSULT ANT will detennine the optimal final locations of all traction power substations based <br />on cost, land availability, and neighborhood intmsion, The CONSULTANT will prepare 30% <br />designs and specifications of all traction power substations along the line. ' , <br /> <br />CONSULTANT will develop the standard design for a mounted third rail system for The <br />CenterLine Project. In conjunction with this design, the CONSULTANT will evaluate the <br />feasibility of an embedded power strip, or a hybrid of options such as electric fuel cells or <br />batteries. This feasibility study will be completed within 120 days after the NTP, in order that <br />The AUTHORITY and the CONSULTANT can make a recommendation to the Board and the <br />AUTHORITY'S TPOC electrification system, <br /> <br />CONSULTANT will also work to develop standard design(s) for catenary poles within 120 days <br />after the NTP, for The CenterLine Project. The CONSULTANT will evaluate the overhead <br />catenary system from the traction power substations to the vehicle pantograph, considering three <br />distinct types of distribution systems: simple catenary, twin contact wire system, 2nd single <br />contact wire with parallel feeders, To the extent practical, the use of a single wire contact system <br />supplemented by underground parallel feeder cables will be used for locations where càtenary <br />will be used for The CenterLine Project. This will be especially important where the CenterLine <br />project borders residential or is in street nmning in a visually sensitive environment. <br /> <br />Where the catenary system is used in design it is to be, in general, auto-tensioned along the line. <br />Care will be exercised in locating and minimizing the visual intrusion of any auto-tensioning <br />poles and weights, Where special trackwork requires the train to travel 35 mph or less, the use of. <br />a system of single wire contacts is encouraged to minimize visual clutter. In the CMF, the <br />catenary system can be a single wire contact system fixed tensioned to adjacent structures if third <br />rail is not used, <br /> <br />In all situations, emphasis tlu'oughout the project will be on minimizing unnecessary visual <br />intrusion, <br /> <br />CONSULT ANT shall prepare standard drawings and 30% drawings of the power distribution <br />system as well as tables detailing the quantities and specifications of all its components, <br /> <br />42 <br /> <br />~- <br />-~~.... <br /> <br /> <br />C5l- v/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.