<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />CONSULTANT will undertake a detailed corrosion control study and develop mitigation <br />measures for atmospheric, soil, and stray current corrosion, The CONSULTANT will ensure the <br />geotechnical investigation captures needed data on soil resistivity, etc. The CONSUL1;ANT <br />will develop corrosion control guidelines and designs for the trackwork designers, structural <br />engineers and CMF designers, and provide recommendations to utilities for the protection and <br />testing of their underground networks, <br /> <br />Deliverables: The CONSULTANT will prepare the following as part of this work task: <br />. The 30% design and equipment specification for all traction power substations. <br /> <br />. <br /> <br />The 30% design and specification of the traction electrification system including a <br />detailed listing of all components making up that system, <br /> <br />. <br /> <br />A Corrosion Protection Report establishing corrosion control guidelines with specific <br />recommendations for the project designers and outside utility companies.' , <br /> <br />The following paragraphs bescribes in greater detail the work scope that resulted <br />CONSULTANT's input during negotiations of the PE consulting services contract. <br /> <br />from the <br /> <br />The following clariftcations are included as part of the CONSULTANT's Schedule Of Values: <br /> <br />Task 10,01 System Criteria <br />. Design Criteria for PE 10. scope of work. <br />. Overall system power conftguration and major performance requirements (Schedule of <br />Values Tasks 10.02,10.03, and 10.04) are resolved by the end of the 4th month. <br />e Operation Plan (Schedule of Values Task 1.10) is accepted as baseline (tramc aspects) by <br />end of 4th month, This includes decisions on power supply for potential extensions, <br />. The RFP comment on page 5 (2nd paragraph of 1.6) that "...not...unique design or <br />technology..." is interpreted not to apply to the advanced technology power distribution <br />schemes to be studied in PE 10, <br /> <br />Task 10,02 Evaluate RFP Alternate power Systems <br />. Report presentations, including reasonable appropriate graphics, provided for public/policy <br />meetings, <br /> <br />Task 10,03 Develop Standard OCS Pole <br />. Same as noted for Schedule of Values Task 10,02. <br /> <br />Task 10,04 Evaluate Alternate power Distribution Schemes <br />. Same as noted for Schedule of Values Task 10.02, <br /> <br />Task 10.05 Develop Program Definition <br />. Scope is to document the decisions from Schedule of Values Tasks 10.02,10,03, 10.04, and <br />the tentative results of Schedule of Values Task 10.06 as integrated into a complete design <br />and ftnalize a configuration on which basis the Preliminary Design (Schedule of Values Task <br />10.07) shall proceed, Output is a report with drawings and text appropriate to describing the <br /> <br />43 <br /> <br />~~- <br /> <br /> <br />6l-~ <br />