Laserfiche WebLink
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />17.01,02 Santa Ana Garden Channel Pier Placement Hydraulic StUdy <br />. As alignment refinement progresses where the structure conflict with flood control channel; <br />and aU necessary calculations will be made to determine a box culvert sections and will <br />provide aU documentation for obtaining proper permits. <br /> <br />17.01.03 Drainage StUdy <br />. As defined in PE 17.1. <br /> <br />PE 17.2 Utility Protection and Relocation <br /> <br />The purpose of this work element is to develop preliminary plans to protect or relocate utilities <br />along The CenterLine Project route and estimate when this work is needed in the construction <br />process, <br /> <br />, , <br /> <br />CONSULTANT wiU review Conceptual Engineering drawings, meet with utility companies and <br />agencies, and other sources to determine the type and location of utilities which are affected by <br />the project. Where uncertainty exists, it may be necessary to do field checking including digging <br />test pits. All this information will be transcribed onto base maps and data tables. . <br /> <br />CONSULT ANT will update this information as Preliminary Engineering advances so that <br />impacts to any utility can be tracked, The CONSULTANT will determine what utilities are <br />impacted and recommend to The AUTHORITY and the utility company whether it needs to be <br />removed, relocated, or protected in place. In such cases, the CONSULTANT will prepare <br />preliminary designs for the disposition of the utility. The CONSULTANT will also estimate for <br />The AUTHORITY any betterment which will occur as a result of the work. <br /> <br />DeJiverables: The end products for this task will be: <br /> <br />. <br /> <br />Maps which locate and specify all utilities which are expected to be affected by The <br />CenterLine Project and detailed utility data and tracking tables. <br /> <br />. <br /> <br />Identification of and preliminary engineering drawings for all utilities which need to be <br />removed, relocated, or protected in place. <br /> <br />The following paragraphs describes in greater detail the work scope that resulted <br />CONSULTANT's input during negotiations of the PE consulting services contract. <br /> <br />from the <br /> <br />The following clarifications are part of the CONSULTANT's Schedule ofYalues: <br /> <br />Task 17.02,01 Utility Conflicts Identification <br />. As defined in PE 17.2, <br /> <br />Task 17,02.02 Relocation/Protection Concepts <br />. As defined in PE 17.2. <br /> <br />56 <br /> <br />-- <br />"...,...,.-. <br /> <br /> <br />6'-' <br />