My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />." <br />,..-- <br /> <br />PE 17.1 Hydrology Studies <br /> <br />The purpose of this task is to perfonn needed hydrologicallhydraulic studies of The CenterLine <br />Project to make sure the final project and its associated construction activity does not negatively <br />affect the county's drainage facilities, <br /> <br />The CONSULTANT will review available infonnation on flood plains and critical stonn <br />drainage watersheds from the Conceptual Engineering work, the U.S. Geological Survey high <br />water and flow records, state and local flood plain mapping, etc, Where CenterLine project <br />facilities impinge on these areas the CONSULTANT shall perfonn the necessary studies to make <br />sure the project's designs confonn to applicable federal, state, and local regulations conceming <br />construction and drainage requirements in those areas, especially in light of the more stringent <br />standards during construction that have been established by the Regional Water Quality Control <br />Board. <br /> <br />, , <br />Each station site and the CMF will have a hydrology evaluation undertaken to recommend <br />necessary grading and drainage designs which will then be incorporated into Preliminary <br />Engineering design, The CONSULT ANT will analyze all line segments to assure surface run-off <br />is properly channeled into existing stonn drain facilities, If these evaluations require any new <br />drainage facilities needed to handle the stonn flow from the project, the facilities will be located, <br />sized, specified and incorporated into the project design, <br /> <br />The CONSULTANT will also evaluate all construction plans to detelmine the preliminary stonn <br />run-off management plan for construction, Recommendations will be incorporated into fmal <br />designs, <br /> <br />Deliverables: The CONSULTANT will prepare the following: <br /> <br />. <br /> <br />A series of working papers on the hydrology studies undertaken, including drainage study <br />recommended design directives and specifications, <br /> <br />. <br /> <br />A series of working papers on each expected construction <br />specific steps for the stonn run-off management plan, <br /> <br />package recommending <br /> <br />The following paragraphs describes in greater detailed the work scope that resulted from the <br />CONSULT ANT's input during negotiations of the PE consulting services contract. <br /> <br />The following clarifications are included as part of the CONSULTANT's Schedule of Values: <br /> <br />Task 17,01,01 Sail Diego Creek Pier Placemellt Hydraulics Study <br />. As alignment refmement progresses; where the substructure piers fall within the embankment <br />of San Diego Creek Channel, a highwater calculation will be provided and ~ll necessary <br />documentation for obtaining proper pennits. <br /> <br />55 <br /> <br /> <br />(JOt <br />
The URL can be used to link to this page
Your browser does not support the video tag.