Laserfiche WebLink
The Motion Detectors for ladder protection shall have a three -position digital direction <br />control switch the controls the direction of movement required for a sensor alarm. <br />The detector shall be selectable to detect only approaching movement, detect only <br />receding movement, or detect both approaching and receding movement. The <br />Motion Detector for ladder protection shall be ProTech Piramid No. SDI-77XL-DIR-LT <br />with No. PH-6J adjustable ladder mounting bracket and junction box or approved <br />equal. See Table 2.2 for required motion detectors. <br />Table 2.2 — Motion Detectors <br />Motion <br />Site <br />Motion <br />Location (1) <br />Mounting (1) <br />Detection Area <br />Detector <br />Detector Part <br />Description <br />Number <br />Number <br />MD-1 <br />West <br />SDI-77XL2 <br />Approx. 90' <br />Mount on new <br />Main Entrance Gate <br />Reservoir <br />East of N-W <br />free standing <br />corner <br />pole. <br />Note: MD-1 and <br />MD-2 mount on <br />same pole <br />MD-2 <br />West <br />SDI-77XL2 <br />Approx. 90' <br />Mount on new <br />Booster Pumps from <br />Reservoir <br />East of N-W <br />free standing <br />North <br />corner <br />pole. <br />Note: MD-1 and <br />MD-2 mount on <br />same pole <br />MD-3 <br />West <br />SDI-77XL- <br />Top of <br />Mount on top of <br />Reservoir Ladder <br />Reservoir <br />DIR-LT <br />Reservoir <br />Reservoir <br />Ladder <br />ladder. <br />MD-4 <br />West <br />SDI-77XL2 <br />South of <br />Mount on <br />Booster Pumps from <br />Reservoir <br />Booster <br />existing light <br />South <br />Pumps <br />pole. <br />MD-5 <br />West <br />SDI-77XL2 <br />Approx. 180' <br />Mount on new <br />Motor Control Center <br />Reservoir <br />East of S-W <br />free standing <br />(MCC) <br />corner <br />pole. <br />MD-6 <br />West <br />SDI-76XL2 <br />S-W corner <br />Mount on <br />Chemical Building <br />Reservoir <br />of Chemical <br />Chemical <br />Entrance <br />Buildinq <br />Buildin <br />MD-7 <br />West <br />SDI-76XL2 <br />Near S-E <br />Mount on new <br />Back Entrance Gate <br />Reservoir <br />Corner <br />free standing <br />and Well 20 <br />pole <br />MD-10 <br />Well 30 <br />SDI-77XL2 <br />Near S-W <br />Mount on new <br />Well 30 from South <br />Corner <br />free standing <br />pole <br />Note: CCTV-10 <br />and MD-10 <br />mount on same <br />pole <br />MD-11 <br />Well 30 <br />SDI-77XL2 <br />Near N-W <br />Mount on new <br />Main Gate and Well <br />Corner <br />free standing <br />30 from North <br />pole <br />MD-20 <br />Well 21 <br />SDI-77XL2 <br />Near WE <br />Mount on new <br />Main Gate and Well <br />Corner <br />free standing <br />21 from East <br />ole <br />Notes: <br />(1) All new poles shall be installed a minimum of 5 feet away from all perimeter fence lines and <br />Motion Detectors shall be mounted at a height of 8 to 12 feet. <br />City of Santa Ana Security Management System Specific Requirements <br />Security Management System Project Page 17100-6 <br />SantaAna_SMS_17100 <br />