My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LINEAR SYSTEMS 1 - 2005
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
LINEAR SYSTEMS 1 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 4:22:38 PM
Creation date
9/8/2005 10:34:50 AM
Metadata
Fields
Template:
Contracts
Company Name
Linear Systems
Contract #
A-2005-166
Agency
Police
Council Approval Date
7/5/2005
Expiration Date
7/21/2006
Insurance Exp Date
4/25/2008
Destruction Year
2018
Notes
Amended by A-2005-166-01, -02, A-2009-046, A-2010-230, A-2011-066, A-2011-236, A-2012-197
Document Relationships
LINEAR SYSTEMS 1A - 2007
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
LINEAR SYSTEMS 1B - 2008
(Amended By)
Path:
\Contracts / Agreements\L
LINEAR SYSTEMS 1C - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
LINEAR SYSTEMS 1D - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
LINEAR SYSTEMS 1E - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
LINEAR SYSTEMS 1F - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
LINEAR SYSTEMS 1G - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and/or SOP. Prepare integration plan with existing hardware from additional <br />manufacturers Prepare integration plan for new and existing networks and servers <br />provided by Santa Ana Police Department's Information Systems Department. <br />B. Assembly <br />Assemble individual systems. <br />Install software. <br />Integrate individual systems and components into complete system. <br />Manufacture and assemble digital camera kits. <br />Assemble system documentation and manuals in single source. <br />C. Testing <br />Test as individual components. <br />Test as complete system. <br />D. Installation <br />Equipment will be installed on site as per Santa Ana Police Department's requested <br />schedule. <br />Equipment will be tested on-site. <br />Equipment will be integrated into existing workflow (systems and/or servers). <br />Equipment will be calibrated. <br />Provide a list of LINEAR SYSTEMS Tech Support contact names and extensions. <br />E. Training <br />Review of final Policy and Procedures and/or SOP. <br />Advanced Administrator training during installation of system. <br />User training for Linear Digital Lab Solution. <br />Advanced Administrator training for integration of D.I.M.S. software into existing <br />infrastructure. <br />Train the City representative for D.I.M.S. software and hardware solution. <br />Train the City representative for crime scene digital SLR camera kits. <br />User training for crime scene digital SLR camera kits. <br />Train the City representative for photo lab digital SLR camera kits. <br />User training for photo lab digital SLR camera kits. <br />The following limits are based on the included cost proposal: <br />Advanced on-site Administrator training 1 day @ 8 hours during installation <br />Advanced Administrator training for integration of D.I.M.S. 1 day @ 8 hours during <br />installation <br />Advanced on-site Administrator follow-up training 2 day @ 8 hours after installation <br />On-site user training Linear Digital Lab Solution 2 day @ 8 hours per day <br />On-site user follow-up training Linear Digital Lab Solution 2 day @ 8 hours per day <br />Advanced Archive Administrator training I day @ 4 hours per day <br />On-site user training digital cameras 1 day @ 4 hours per day <br />On-site follow-up training as needed 4 day @ 8 hours per day <br />Follow-up training at LINEAR SYSTEMS As needed (unlimited) <br />Training segments will need to be combined to complete eight-hour consecutive days. <br />Total training days will be ten days at eight hours per day with four days allocated for <br />unscheduled training. Additional on-site training or onsite consultation with the <br />Information Systems Department will be available at additional cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.