Laserfiche WebLink
— Work Plan 2 -16 <br />Section 2 — Work Plan <br />The scope of the engineering services to be provided to the City of Santa Ana in support of the <br />West Pump Station Facilities Upgrade Project has been divided into 7 primary tasks and 33 <br />subtasks. Tasks, subtasks, and deliverables are listed in Table 1. A description of task objectives, <br />methodologies, and procedures is presented after the table. <br />Table 1. Proposed Tasks, Subtasks, and Deliverables <br />Tasks and Subtasks <br />Deliverables <br />1. Project Management <br />Initial Design Meeting Agenda and <br />1.1 Initial Design (Kickoff) Meeting <br />Minutes <br />1.2 Progress Review Meetings (3) <br />3 Progress Review Meetings Agendas <br />1.3 Monthly Progress Reports (3) <br />and Minutes <br />Monthly Progress Reports <br />2. Data Collection <br />None <br />2.1 Drawings, Pump/Driver Data <br />2.2 Hydraulics <br />23 Permitting Research <br />2.4 Maintenance Records <br />3. Condition Assessment (Optional) <br />Condition Assessment Memorandum <br />3.1 Data Sheet Preparation <br />3.2 Structural Assessment <br />3.3 Mechanical Assessment <br />3.4 Electrical/Controls Assessment <br />3.5 Condition Assessment Memorandum <br />3.6 Condition Assessment Presentation <br />4. Pre - Design Work <br />Geotechnical Investigation Report <br />4.1 Geotechnical Investigation Report <br />Three Copies of Draft Preliminary <br />4.2 Structural Improvements <br />Engineering Design Report <br />4.3 Mechanical Improvements <br />4.4 Electrical/Controls Improvements <br />Ten Copies of Final Preliminary <br />4.5 Landscape /Irrigation Plan (As- Needed) <br />Engineering Design Report <br />4.6 Permitting Requirements <br />Permitting Documentation/Applications, <br />4.7 Pre - Design Report <br />(if required) <br />4.8 Preliminary Design Review Meeting <br />Preliminary Design Review Meeting <br />Agenda and Minutes <br />Conepmry Confidential • Trade Secret and Proprietary Information of Metcalf & Eddy, Inc. <br />• <br />