My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
METCALF & EDDY, INC. 1 -2005
Clerk
>
Contracts / Agreements
>
M
>
METCALF & EDDY, INC. 1 -2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 2:04:55 PM
Creation date
9/8/2005 12:14:41 PM
Metadata
Fields
Template:
Contracts
Company Name
Metcalf & Eddy, Inc.
Contract #
A-2005-077
Agency
Public Works
Council Approval Date
4/4/2005
Expiration Date
12/31/2006
Insurance Exp Date
4/1/2007
Destruction Year
2011
Notes
Amended by A-2006-120, A-2007-123, A-2008-033
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— Work Plan 2 -16 <br />Section 2 — Work Plan <br />The scope of the engineering services to be provided to the City of Santa Ana in support of the <br />West Pump Station Facilities Upgrade Project has been divided into 7 primary tasks and 33 <br />subtasks. Tasks, subtasks, and deliverables are listed in Table 1. A description of task objectives, <br />methodologies, and procedures is presented after the table. <br />Table 1. Proposed Tasks, Subtasks, and Deliverables <br />Tasks and Subtasks <br />Deliverables <br />1. Project Management <br />Initial Design Meeting Agenda and <br />1.1 Initial Design (Kickoff) Meeting <br />Minutes <br />1.2 Progress Review Meetings (3) <br />3 Progress Review Meetings Agendas <br />1.3 Monthly Progress Reports (3) <br />and Minutes <br />Monthly Progress Reports <br />2. Data Collection <br />None <br />2.1 Drawings, Pump/Driver Data <br />2.2 Hydraulics <br />23 Permitting Research <br />2.4 Maintenance Records <br />3. Condition Assessment (Optional) <br />Condition Assessment Memorandum <br />3.1 Data Sheet Preparation <br />3.2 Structural Assessment <br />3.3 Mechanical Assessment <br />3.4 Electrical/Controls Assessment <br />3.5 Condition Assessment Memorandum <br />3.6 Condition Assessment Presentation <br />4. Pre - Design Work <br />Geotechnical Investigation Report <br />4.1 Geotechnical Investigation Report <br />Three Copies of Draft Preliminary <br />4.2 Structural Improvements <br />Engineering Design Report <br />4.3 Mechanical Improvements <br />4.4 Electrical/Controls Improvements <br />Ten Copies of Final Preliminary <br />4.5 Landscape /Irrigation Plan (As- Needed) <br />Engineering Design Report <br />4.6 Permitting Requirements <br />Permitting Documentation/Applications, <br />4.7 Pre - Design Report <br />(if required) <br />4.8 Preliminary Design Review Meeting <br />Preliminary Design Review Meeting <br />Agenda and Minutes <br />Conepmry Confidential • Trade Secret and Proprietary Information of Metcalf & Eddy, Inc. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.