My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
METCALF & EDDY, INC. 1 -2005
Clerk
>
Contracts / Agreements
>
M
>
METCALF & EDDY, INC. 1 -2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 2:04:55 PM
Creation date
9/8/2005 12:14:41 PM
Metadata
Fields
Template:
Contracts
Company Name
Metcalf & Eddy, Inc.
Contract #
A-2005-077
Agency
Public Works
Council Approval Date
4/4/2005
Expiration Date
12/31/2006
Insurance Exp Date
4/1/2007
Destruction Year
2011
Notes
Amended by A-2006-120, A-2007-123, A-2008-033
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
—AVork Plan 2 -26 <br />Table 1. Proposed Tasks, Subtasks, and Deliverables <br />Tasks and Subtasks <br />Deliverables <br />5. Engineering Design <br />Preliminary (60 %) Set of Construction <br />5.1 60% Submittal <br />Drawings, Specifications, Bid Items List, <br />5.2 95% Submittal <br />and Cost Estimate <br />5.3 100% Submittal <br />Permit(s), As Required <br />Final (95 %) Set of Construction <br />Drawings, Specifications, Bid Items List, <br />and Cost Estimate <br />City- Verified (100 %) Set of Construction <br />Drawings, Specifications, Bid Items List, <br />and Cost Estimate <br />6. Bid Period Support <br />Bid Review Memorandum <br />6.1 Bid Preparation Assistance <br />Written Summary of Responses to RFIs <br />6.2 Bid Period Response to RFIs <br />6.3 Bid Review/Ranking <br />7. Construction Support <br />Approved Shop Drawings <br />7.1 Review Contractor Submittals (40) <br />Written Summary of Responses to RFIs <br />7.2 Respond to RFIs (60) <br />7.3 Prepare Design Change Orders <br />Change Orders, As Required <br />7.4 Periodic Site Visits (6) <br />Record Drawings (Optional) <br />7.5 Record Drawings (Optional) <br />O &M Manuals (Optional) <br />7.6 O&M Manuals (Optional) <br />Task 1. Project Management <br />Objectives: Coordinate consultant activities with City engineers; keep City informed of project <br />progress; promptly advise City of any problems, delays, or necessary changes to the scope of <br />work; track and control schedule and budget; invoice City monthly. <br />1.1 Initial design 21feeting: An initial design meeting will be scheduled to discuss and analyze <br />the project. The agenda for the meeting will include: <br />• Introduction of consulting team to City engineers, operations, and maintenance personnel <br />involved in the project. <br />• Presentation of this Work Plan. <br />Discussion of project schedule. <br />Discussion of access constraints, maintenance and operation issues. <br />Definition of lines of communication. <br />1.2 Progress Review Meetings: Progress review meetings will be scheduled periodically to <br />bring City representatives up to date on the work performed by consulting team. Meetings will <br />be held bi- weekly at City facilities. Conference calls may be used in lieu of meetings when the <br />amount of information to be exchanged is small, at the request of the City, or when there is no <br />Company Confidential • Trade Secret and Proprietary Information of.kfetcalf & Eddy, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.