Laserfiche WebLink
Page 12 of 24 <br />(5) Hand drag or broom the skin lines and perimeter backstop/fence areas. <br />(6) Finish by watering down infield. <br />c) Daily outfield maintenance shall include: <br />(1) Irrigation checks and repairs to assure that irrigation heads are at the proper grade <br />and no "slippery" areas exist. <br />(2) Fill in of divots and depressions with #20 white silica sand mixed with Lesco Eagle <br />Blend perennial rye grass seed to re-establish the areas. <br />d) Weekly Maintenance <br />The Contractor shall provide ball diamond maintenance as set for the in Attachment 2 <br />once per week by checking to make sure the arc line is correct pursuant to the standard <br />set forth by Director. Contractor will then edge the skin line to achieve a smooth crisp arc <br />where the brickdust meets the sport turf. Fence lines and warning track shall also be <br />edged, using a McClain's edger or approved equal, to create crisp straight lines. <br />e) Non -recurring maintenance: <br />During inclement weather the Contractor shall work to reopen baseball fields as soon as <br />practicable. The Contractor shall use Diamond Dry or an approved equal to dry infields. <br />In addition, the Contractor may elect to use hand pumps or any other reasonable method <br />necessary to reopen the fields. <br />11. Soccer /Football Field Maintenance <br />a) All soccer/football fields shall be inspected every day, Monday through Friday. <br />Contractor shall look for divots, depressions, debris, and other turf marring conditions. If <br />discovered, the Contractor shall backfill any divots and depressions with #20 white silica <br />sand and Lesco "Eagle Blend" perennial rye grass. All debris shall be removed from the <br />fields daily upon discovery. <br />b) The Dan Young Soccer Complex Field #4 Synthetic Turf sport turf maintenance and <br />inspection. The field shall be maintained once a month. Maintenance will include <br />"grooming" the Feld using "grooming" equipment provided by the City. The field shall be <br />inspected every day Monday through Friday. Contractor shall remove debris from the <br />field upon discovery. <br />12. Sport Court Maintenance <br />a) All sport courts shall receive maintenance once per week. This maintenance shall <br />include the collection of debris, the blowing off of courts and the replacement of nets <br />(tennis and basketball) when deemed worn. The City shall furnish nets. <br />13. General Maintenance and Clean-up For All Parks <br />a) All trash and debris on the ground or in trash receptacles shall be removed from all <br />worksites each day Monday through Friday. <br />