My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIDORI GARDENS 3
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MIDORI GARDENS 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 1:07:15 PM
Creation date
9/23/2005 3:54:56 PM
Metadata
Fields
Template:
Contracts
Company Name
Midori Gardens
Contract #
A-2005-115
Agency
Parks, Recreation, & Community Services
Council Approval Date
6/6/2005
Expiration Date
6/30/2007
Insurance Exp Date
8/1/2006
Destruction Year
2012
Notes
Amended by A-2005-115-001
Document Relationships
MIDORI GARDENS 3A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 13 of 24 <br />b) The contractor shall rake, hand remove, or vacuum leaves that are not absorbed by <br />planting. This shall be done as often as required to maintain a neat appearance, or <br />prevent plants from being smothered by seasonal leaf drop. <br />c) After heavy windstorms, the all parks area shall be cleaned of litter, fallen branches, etc., <br />which are in excess of normal amounts. <br />d) The Contractor shall keep sidewalks and paved areas in the medians swept and cleaned <br />of any debris, weeds, dirt or soil at all times. <br />e) Drain inlets shall be cleaned on a regular basis at least once per day to avoid flooding of <br />areas during inclement weather. <br />14. Other Requirements <br />a) Replacement of Plant Material <br />The Contractor shall replace, at Contractor's own expense, any turf, ground cover, <br />shrubs, or other plant material requiring replacement through normal attrition or due to <br />infestation or contractor's failure to provide maintenance in accordance with the <br />provisions of this agreement. These requirements are not to be construed as requiring <br />the Contractor to replace plant materials due to conditions beyond the Contractor's <br />control but are to be considered strictly as a normal maintenance condition within <br />accepted industry practice. It Is The Intention Of The City To Require High -Level <br />Landscape Maintenance. <br />b) New Construction <br />In the event of new construction within a portion of a work site, the Director may delete a <br />portion of or the entire work site from contractual maintenance during the construction <br />period. The deletion of this portion of work will be reflected as a reduction in the monthly <br />payment to the Contractor. The amount of reduction will be based on the percentage of <br />area involved and agreed upon by the City and the Contractor in writing. <br />III. EXTRA WORK <br />A. If damage or malfunction occurs to plant material, or irrigation system equipment (from valve to water <br />meter) with the exception of irrigation heads and lateral lines by any of the following: <br />The addition of may be considered outside the scope of this Agreement <br />(1) Acts of God <br />(2) Civic Disorder <br />(3) Vehicle Collision <br />(4) Vandals <br />(5) Excavation or re -surfacing of the street <br />(6) Power failures <br />(7) Underground wiring damage <br />Contractor will not be considered responsible for replacement. Contractor must demonstrate to the <br />satisfaction of Director that one of the above occurred in order to be excused from performing under the <br />Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.