Laserfiche WebLink
Page 13 of 24 <br />b) The contractor shall rake, hand remove, or vacuum leaves that are not absorbed by <br />planting. This shall be done as often as required to maintain a neat appearance, or <br />prevent plants from being smothered by seasonal leaf drop. <br />c) After heavy windstorms, the all parks area shall be cleaned of litter, fallen branches, etc., <br />which are in excess of normal amounts. <br />d) The Contractor shall keep sidewalks and paved areas in the medians swept and cleaned <br />of any debris, weeds, dirt or soil at all times. <br />e) Drain inlets shall be cleaned on a regular basis at least once per day to avoid flooding of <br />areas during inclement weather. <br />14. Other Requirements <br />a) Replacement of Plant Material <br />The Contractor shall replace, at Contractor's own expense, any turf, ground cover, <br />shrubs, or other plant material requiring replacement through normal attrition or due to <br />infestation or contractor's failure to provide maintenance in accordance with the <br />provisions of this agreement. These requirements are not to be construed as requiring <br />the Contractor to replace plant materials due to conditions beyond the Contractor's <br />control but are to be considered strictly as a normal maintenance condition within <br />accepted industry practice. It Is The Intention Of The City To Require High -Level <br />Landscape Maintenance. <br />b) New Construction <br />In the event of new construction within a portion of a work site, the Director may delete a <br />portion of or the entire work site from contractual maintenance during the construction <br />period. The deletion of this portion of work will be reflected as a reduction in the monthly <br />payment to the Contractor. The amount of reduction will be based on the percentage of <br />area involved and agreed upon by the City and the Contractor in writing. <br />III. EXTRA WORK <br />A. If damage or malfunction occurs to plant material, or irrigation system equipment (from valve to water <br />meter) with the exception of irrigation heads and lateral lines by any of the following: <br />The addition of may be considered outside the scope of this Agreement <br />(1) Acts of God <br />(2) Civic Disorder <br />(3) Vehicle Collision <br />(4) Vandals <br />(5) Excavation or re -surfacing of the street <br />(6) Power failures <br />(7) Underground wiring damage <br />Contractor will not be considered responsible for replacement. Contractor must demonstrate to the <br />satisfaction of Director that one of the above occurred in order to be excused from performing under the <br />Agreement. <br />