Laserfiche WebLink
<br />." <br /> <br />I. Problems - a discussion of significant problems encountered during the contract and <br />how they were resolved. <br />J. Recommendations <br /> <br />3. CONTRACTOR shall submit three stapled originals of the final report, incorporating <br />AQMD's comments, no later than 13 months after commissioning. This document shall <br />be considered in the public domain, in conformance with the California Public Records <br />Act (Govemment Code Section 6250 et seq.). . <br /> <br />4. CONTRACTOR shall submit a two-page project synopsis, along with the final report. <br />Attachment 3 to this contract provides the format and content to be used for this synopsis. <br />In addition to a hard copy, CONTRACTOR shall provide the synopsis in an electronic <br />version, using Microsoft WORD. All color photographs and images shall be embedded <br />within the synopsis AND provided separately in digital format, such as .ppt, .tif. or .jpg, <br />on a CD or sent electronically. <br /> <br />\. <br /> <br />, <br /> <br />; <br />E:\tech_adv\Conlracts Folde~\Infrastruclure Contracts\Air Products & Chemicals H2 Stations Five Cities SO\V&PS.doc <br />