Laserfiche WebLink
<br />Attachment A <br /> <br />CITY OF SANTA ANA <br /> <br />CONSTRUCTION AND DEMOLITION RATES <br />JULY 1, 2005 <br /> <br />Service Maximum Hauling Host Fee Maximum Rates With <br /> and Processing Rate 12.80/0 Surcharae <br />Roll-off containers $386.00 $21.00 $466.74 <br />- mixed C and D <br />Up to 7 tons/4 <br />days <br />Roll-off containers To be determined by Actual Rate Charged plus <br />- end user loads CONTRACTOR 12.8% of gross receipts <br />Per ton over 7 $38.20 per ton $3 per ton $47.25 per ton <br />Days 5-14 $5 $5.73 <br />3 yard bin $92.24 $105.78 <br />Up to .5 tons/14 <br />days <br />Cancellation fee $50 $57.34 <br />Trip/relocation fee $50 $57.34 <br />Graffiti removal $25 $28.67 <br />Hard to handle $10 $11.47 <br />loads - per ton* <br /> <br />*May only be charged to Customers if actually charged to Contractor by Madison Materials. <br />Hard to handle loads include loads that contain 50% or more of the following: <br /> <br />. Items over 20 feet in length or 3 feet in diameter, including large chunks of <br />concrete, boulders, inert materials mixed with rebar, and tree stumps <br /> <br />. Appliances <br /> <br />· Fine dust, such as sawdust and marble powder <br /> <br />. Tires <br /> <br />. U niversa I or E-wastes <br /> <br />20 <br />