Laserfiche WebLink
<br />Attachment B <br /> <br />CITY OF SANTA ANA <br /> <br />MADISON MATERIALS RATES FOR SANTA ANA CUSTOMERS <br />JULY 1, 2005 <br /> <br />Item Description Maximum Processing Host Fee Maximum <br /> Rate Rate With <br /> 12.8 0/0 <br /> Surcharge <br />Roll-off containers and $38.20 per ton $3.00 per ton $47.25 per ton <br />bins - mixed C&D <br />Hard to handle loads - $ 10 $11.47 <br />added oer ton* <br /> <br />* Hard to handle loads include loads that contain 50% or more of the following: <br /> <br />· Items over 20 feet in length or 3 feet in diameter, including large chunks of <br />concrete, boulders, inert materials mixed with rebar, and tree stumps <br /> <br />. Appliances <br />. Fine dust, such as sawdust and marble powder <br /> <br />. Tires <br /> <br />. Universal or E-wastes <br /> <br />21 <br />