My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LG2WB ENGINEERS DBA LINSCOTT LAW & GREESNSPAN 1 - 2002
Clerk
>
Contracts / Agreements
>
L
>
LG2WB ENGINEERS DBA LINSCOTT LAW & GREESNSPAN 1 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2019 11:56:34 AM
Creation date
3/23/2006 3:54:11 PM
Metadata
Fields
Template:
Contracts
Company Name
LG2WB Engineers dba Linscott Law & Greenspan
Contract #
N-2002-165
Agency
Public Works
Expiration Date
11/1/2003
Insurance Exp Date
9/1/2004
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Shahir Gobran <br />1 CITY OF SANTA ANA <br />LLG Reference: 2.95.1787.1 — Fairview Street Widening Project <br />' October 29, 2002 <br />F N G I N F E R S Page <br />SCOPE OF WORK <br />Project Mobilization <br />1. Confirm work program with City of Santa Ana staff, and fmalize scope of work for additional <br />traffic engineering support. Obtain a current set of improvement plans prepared for the <br />Fairview Street Widening project. <br />2. Obtain existing 2002 peak period traffic count data for key study intersections and 24-hour <br />machine counts for key roadway segments from the City of Santa Ana. <br />Data Collection and Research <br />3. Visit the project study area to update our current inventory of existing conditions at the study <br />intersections and roadway segments evaluated as part of the Traffic Impact Analysis for the <br />Fairview Street Widening. <br />4. Re -inventory existing site access characteristics for existing non-residential development <br />whose parking may be impacted by the widening of Fairview Street. <br />Traffic Impact Analysis <br />5. Utilizing existing 2002 traffic count data and prior traffic projections, forecast Year 2025 <br />traffic volume conditions at the key study intersections and roadway segments for use in the <br />preparation of detailed intersections capacity evaluations, queuing capacity calculations, and <br />roadway link analyses. Confirm with the City of Santa Ana the methodology by which Year <br />2025 traffic conditions will be projected. <br />6. Prepare AM and PM peak hour Level of Service (LOS) calculations at the key study <br />intersections for existing conditions, as well as future conditions. The LOS calculations for <br />key signalized intersections will be based on the Intersection Capacity Utilization (ICU) <br />methodology; unsignalized study intersections will be evaluated using the Highway Capacity <br />Manual (HCM) methodology. For intersections under the jurisdiction of Caltrans, the HCM <br />methodology for signalized intersections will be used to calculate the existing and future <br />LOS. <br />7. Confirm adequacy of prior improvements recommended as part of the Traffic Impact Analysis <br />for the Fairview Street Widening, dated October 30, 2001. If necessary, identify additional <br />intersection improvements to accommodate Year 2025 traffic conditions. <br />8. Revise all text, tabular, and graphic materials of the Traffic Impact Analysis for the Fairview <br />Street Widening, dated October 30, 2001 and submit updated copies to the Planning Center. <br />
The URL can be used to link to this page
Your browser does not support the video tag.