Laserfiche WebLink
• Task 5: 24Seven System Interfaces <br />Task Description: <br />Assist the City with the installation of the following interfaces as defined in the ICD document — <br />Attachment A.2: <br />• CAD Interface— CAD Adapter <br />• Telestaff Interface <br />CompuDyne Responsibilities: <br />a. Assist with the installation of interfaces in accordance with the ICD document — Attachment <br />A.2 <br />b. Test interfaces. <br />City Responsibilities: <br />a. Assume responsibility for any hardware, software licenses, modifications or additions to any <br />systems not supplied, installed, tested, or licensed by CompuDyne. <br />• b. Act as the liaison between the agencies and third party vendors required to support these <br />interfaces. <br />c. Upgrade Telestaff to version 2.2 <br />d. Provide CompuDyne with the physical connections for each interface, to enable CompuDyne to <br />test the functionality of each interface in an appropriate environment. <br />e. If the interface(s) are currently in operation, it is the City's responsibility to disconnect each of the <br />interfaces from the operational environment to facilitate interface testing. <br />Completion Criteria: <br />This task is complete once all interfaces have been demonstrated to function in accordance with the <br />Application Tailoring Document. Delays or unavailability of external systems and /or interfaces not made <br />available to CompuDyne shall not delay completion of this task. In those cases where demonstration is <br />delayed through no fault of either the Client or CompuDyne, the City shall authorize the demonstration of <br />the interface(s) function at a later date. Such rescheduling of interface demonstrations shall not delay the <br />scheduled go -live or any subsequent tasks. Task completion will be confirmed by the Client's signature <br />on the task completion letter presented by CompuDyne. <br />• March 10, 2006 Page 13 of 19 Pages SIA Exhibit A — SOW <br />