My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TIBURON (FORMERLY COMPUDYNE - PUBLIC SAFETY - SOFTWARE LICENSE) 2006
Clerk
>
Contracts / Agreements
>
T
>
TIBURON (FORMERLY COMPUDYNE - PUBLIC SAFETY - SOFTWARE LICENSE) 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 12:54:09 PM
Creation date
4/13/2006 10:17:17 AM
Metadata
Fields
Template:
Contracts
Company Name
Compudyne Public Safety & Justice, Inc.
Contract #
A-2005-251
Agency
Fire
Council Approval Date
10/17/2005
Insurance Exp Date
4/1/2006
Notes
Amends A-2000-162
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Task 6: 24Seven Code Table Training <br />Task Description: <br />CompuDyne will conduct the following training in order for City personnel to acquire the knowledge <br />necessary to enter all the data in the 24Seven Prevention, Training, Arson, Hydrants, and Equipment, <br />Facility, and Inventory database tables, as well as any un- configured tables from previous installations, to <br />configure the available parameters to meet SAFD's operational needs of the 24Seven system. <br />Code Table <br />Responsibilities: <br />CompuDyne responsibilities: <br />• a. Work with the City to identify in each module all 24Seven tables requiring configuration, including <br />tables from previously installed versions as well as tables from the newly installed version. <br />b. Provide one (1) print -ready master copy and one (1) CD -ROM for all training materials for this <br />task no less than ten (10) days prior to training. <br />c. Instruct City personnel, including the system administrator, on how to complete the entry of data <br />in the RMS database tables for the Prevention, Training, Arson, Hydrants, and Inventory <br />modules, as well as any un- configured database tables from previous installations. <br />d. Instruct training participants on the configuration options for system functionality. <br />e. Provide phone support, through CompuDyne's Project Manager, for participants of the class after <br />training has been completed. <br />f. Review and correct, by either an application fix or a documentation update any discrepancies in <br />functionality between the ATD, As -Built Documentation and the application as reported by the <br />client prior to training. <br />City responsibilities: <br />a. Assign appropriate personnel, to include the RMS system administrator to attend the 24Seven <br />Configuration Training. <br />40 March 10, 2006 Page 14 of 19 Pages SIA Exhibit A — SOW <br />
The URL can be used to link to this page
Your browser does not support the video tag.