My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VISTA DEL VERDE LANDSCAPE 1 - 2006
Clerk
>
Contracts / Agreements
>
V
>
VISTA DEL VERDE LANDSCAPE 1 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 3:57:30 PM
Creation date
5/5/2006 1:57:08 PM
Metadata
Fields
Template:
Contracts
Company Name
Vista Del Verde Landscape
Contract #
A-2006-020
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/6/2006
Expiration Date
2/29/2008
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. The presence of any structural weakness, disease conditions, decayed trunk or branches, split crotches <br />or branches, should be reported in writing to a City supervisor and corrective measures recommended. <br />When pruning/trimming back trees, the contractor shall make all trees shapely and typical of their species. <br />(Under no circumstances shall central leader trees have their central leader removed without written <br />consent from the Superintendent of Parks or his approved representative.) <br />TREE AND STUMP REMOVAL STANDARDS <br />Trees identified for removal are to be cut back and lowered to the ground in sections. Sections shall be <br />no larger than can be safely controlled. Extreme care must be taken to prevent unsafe working or other <br />hazardous conditions to individuals, landscape, structures, or obstacles. <br />2. Trees shall not be stump cut and felled. <br />3. Tree stumps not designated for removal shall be cut Flush with the ground. <br />4. Tree stumps to be removed shall be completely ground to a minimum of twelve inches (12") below soil <br />surface. All surface roots within this zone shall also be removed by grinding. <br />5. All excavation as a result of this process shall be backfilled exactly level with surrounding soil, completed <br />and fine graded. <br />6. Excess debris, trimmings, branches and wood shall be removed from the work site and shall follow as <br />closely as possible to the removal operation. <br />All areas shall be left clean and free of debris at the close of each day's operation. Work shall not start <br />before 8:00 a.m. or continue past 6:00 p.m. No work is to be scheduled on weekends or national <br />holidays. <br />8. All debris shall be properly disposed of off site and at the contractor's expense. <br />
The URL can be used to link to this page
Your browser does not support the video tag.