My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JOHNSON CHAPEL 2
Clerk
>
Contracts / Agreements
>
J
>
JOHNSON CHAPEL 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:51:49 PM
Creation date
5/26/2006 11:52:03 AM
Metadata
Fields
Template:
Contracts
Company Name
Johnson Chapel The African Methodist Episcopal Church
Contract #
A-2006-110
Agency
Public Works
Council Approval Date
5/1/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FROM <br /> <br />FAX NO. : <br /> <br />Feb. 06 2006 12:50PM P4 <br /> <br />Gates Development Ca. <br />f~OO;':K )1(';~'3K' In(f![)cl <br /> <br />1315 N. Tustin Ave., Suite 162, Orange, CA 92867 (714) 283-2235 Fax: (714) 2B3-22:~ <br />License # 7003B5 <br /> <br />Page 3: <br />ProDosal#5l63 R-l <br /> <br />EOUIPMENT STORAGE ROOM: . .. <br />Provide a new 5x8 equipment storage room with (2) new electrlcal outlets, (1) new hght and sWitch, and a <br />2x2 window. <br /> <br />SIGNAGE: <br />Provide a new face plate change to the existing pole sign. Pennits are not included. <br /> <br />COMPUTERS: <br />Provide computer services to link (3) computers as required. <br /> <br />SECURITY SYSTEMS: <br />Provide for a standard security system as required. <br /> <br />MOVING CONTRACTOR SERVICES: <br />Provide for an packing, boxing, moving and unpacking as required. Work to included moving all items in the <br />existing multiuse building and the portable building. The existing stage area will be dismantled, and <br />relocated and reassembled. <br /> <br />GENERAL CONTRACTORS ITEMS: <br />Provide supervision of the construction trades. Installation of all the minor trades such as saw cutting, <br />trenching. Provide for demo and clean up as required. Provide temporary rentals. Replace as needed the T- <br />Bar ceiling tiles and insulation. Re-install relocated items such as, fire extinguishers, bulletin boards, <br />shelving and the existing wood stage. The existing piano will be relocated and te-tuned. <br /> <br />ROOFING: <br />Remove the old rooting material and inspect the plywood sheeting. At this time we expect to find only 010'= <br />layer of roofing materials installed on the building. If multiple layers do exist, then an additional <br />51,200.00 per layer will be added to the contract. Any damaged or rotten wood will be replaced at an <br />additional cost added to the eontract. InstllIlllew 3 ply BUR system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.