My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARRIS & ASSOCIATES 2 - 2006
Clerk
>
Contracts / Agreements
>
H
>
HARRIS & ASSOCIATES 2 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 11:28:56 AM
Creation date
8/15/2006 11:15:21 AM
Metadata
Fields
Template:
Contracts
Company Name
HARRIS & ASSOCIATES
Contract #
A-2006-192
Agency
PUBLIC WORKS
Council Approval Date
7/17/2006
Insurance Exp Date
8/1/2009
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />.. <br /> <br />o.?"'. ---~?14i<~t?,~-- <br /> <br />S~f" <br /> <br />".~~ll.~;J;';? ,,_'c:.,'~ ~{.:.:;::.",::,,:. <br />- - '. -', :0>'~ <br /> <br />"'.- ..',.. " . !.b'cUl~:{ifJj~;11 J'ti,.f <br />~Task B. Conceptual.Wi9e,j)i,ng .LayCiut'E~hibit <br />".:~_ _ -.''::J1'- _ >-~-'::';~;c--.:_:;r.:::-_:-':u:;-:r.': <br />As me~tio~~d in the Ptoject~pPr?ach,. on~ofi:hecritical first items of work will be to establish a detailed <br />conceptual alignme?t,~in;>ilart? what. is sho,,>n in the RFP Exhibit "B" (see Exhibit 1, elsewhere in this proposal) <br />showing thepreciseaJignmenr of all of the proposed striping, raised medians, parkway curb lines, bus bay turnouts, <br />sidewalks, landscaped parkways, existing I proposed right-of-way lines and required right-of-way acquisitions <br />(including both partial takes and full takes). There will likely be several design alternatives at various locations <br />throughout the project, with the intent of minimizing or consolidating impacts on existing properties. such as <br />considering symmetrical cul-de-sac bulbs versus a cul-de-sac bulbs with an off-set to one side. <br /> <br />The Harris Team will work closely with City staff to developing a sound conceprual alignment that incorporates all <br />of the various city goals to enhance vehicular and pedestrian circulation as well as significantly the improve project <br />area aesthetics. It will be an iterative process between meetings with City staff and office time spent at Harris <br />working to prepare and refine the detailed conceptual alignment until it meers with the City's approval. <br /> <br />A presentation worthy colored exhibit will ultimately be prepared to clearly illustrate the various design elements <br />and layouts for City staff's use at various city council, planning and community meetings. Once City staff has <br />approved the conceptual alignment we will be well positioned to make simultaneous progtess on all of the project <br />design elements at an accelerated pace. <br /> <br /> <br />ca, <br /> <br />~". .~. <br /> <br />Task C. Hydrology and Hydraulics Study Refinements <br /> <br />For the proposed storm drain laterals and catch basins, Harris will refine the previously prepared hydrology & <br />hydraulics study for the Bristol Street Storm Drain plans, from McFadden Avenue to Third Street. As part of that <br />study, Harris already confirmed the existing tributary areas during a detailed field review and prepared a detailed <br />hydrology map (see Exhibit 3, elsewhere in this proposal). Calculations will be performed to confirm the resulting <br />street flooding widrhs along widened Bristol Srreet to establish the required locations and sizes of the proposed <br />and catch basins will also be prepared that extends from the storm drain connection point at McFadden to most <br />upstream tributary area at 5th Street. A stub-out at the upstream end of the proposed storm drain may also be <br />required if tributary flows from 5th Street to 3rd Street so require. <br /> <br />Harris & Associares will use the "WSPG" computer program to model the hydraulics of the proposed storm drain <br />laterals in conformance with City and County design criteria and will utilize a downstream HGL control prepared <br />in the previous mainline storm drain project. <br /> <br />It is our understanding that the City does not presently utilize catch basin filter inserts, such as "Fossil Filters" , to <br />intercept debris from "first flush" flows, rhus they are not anticipated to be part of this project. However, should <br />this requirement change Harris & Associates has extensive experience in implementing these extra water quality <br />measures. <br /> <br />l1arris & Associates will present the lateral storm drain refinement as an "Addendum" to the original Hydrology & <br />Hydraulics Report that was prepared for the mainline storm drain. <br /> <br />Task D: Develop Project Elements <br /> <br />Once City staff has approved the conceptual alignment the entire Harris Team will perform a comprehensive <br />review of information obtained, hold an in-house kick-off meeting and second City staff kick-off meeting with all <br />of the project playets. Each of the team members will develop a comprehensive preliminaty design that addresses <br />the following: <br /> <br />_I Harris & Associates. <br /> <br />Bristol Corridor Widening - Phase I <br />Page-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.