My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARRIS & ASSOCIATES 2 - 2006
Clerk
>
Contracts / Agreements
>
H
>
HARRIS & ASSOCIATES 2 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 11:28:56 AM
Creation date
8/15/2006 11:15:21 AM
Metadata
Fields
Template:
Contracts
Company Name
HARRIS & ASSOCIATES
Contract #
A-2006-192
Agency
PUBLIC WORKS
Council Approval Date
7/17/2006
Insurance Exp Date
8/1/2009
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />", <br /> <br /> <br />.-".<~.-.. <br /> <br />~'?t). <br />{Fuon ~ ,>,; \~i;"; <br />. ."~ ,., . '. . .1.Jf~}fJ~t~'hii <br /> <br />. ~ t6. ,Prepare six (6) Lands"i'~e Iiriga~on PlafShe'ets"ad".= 20' scale showing the pr?posed irrigation construction <br />elemc::_p;~~-frat Co,nfO::ffi to cli,eap~ro~~,st,<]P9-~epts; Also mcluded on these sheers wIll be reqUlred connection [0 <br />existing water System. All construction dements will be clearly defined. <br /> <br />17. P;ep~re fou~:(4) Landscape Irrig'!,tion &'Planting Detail Sheets showing the proposed irrigation and planting <br />typical-sections andvarious construction details required that conform to the approved concepts. <br /> <br />Grand Total = 69 Sheets <br /> <br /> <br />Task B: Partial Take Right-of-Way Acquisition Legal Descriptions and Maps <br /> <br />Once the project layouts are approved and the designs are fur enough along the preparation of the legal descriptions <br />and maps for rhe anticipated partial property takes can begin and would include rhe following: <br /> <br />1. Prepare accurate legal descriptions and maps for the twenty-seven (27) anticipated partial property takes <br />based on the proposed improvements and their associated required right-DE-ways tie to the accurately establish <br />existing property lines and existing street right-DE-ways. Note the number of partial take locations was <br />approximated by City staff and is subject to refinement and fee adjustment on an established "per each" basis <br />once rhe final number is confirmed. The City will provide tide reports for all affected parcels. Note: No <br />temporary construction easement legal descriptions I maps are presently included in the project scope, nor will <br />rhey be prepared for full take acquisirions. <br /> <br />2. Stake proposed right-of-way encroachments into the twenty-seven (27) properties where parrial takes are <br />anticipated (note: staking is intended to be temporary markings, stakes and/or markers). Note the number <br />of partial take locations was approximated by City staff and is subject to refinement and fee adjustment on <br />an established "per each" basis once the final number is confirmed. Note: no other construction staking tasks <br />are presently included in the scope & fees, however, we would be happy to provide these services per a <br />separate proposal once all of the construction elements are clearly defined in the project plans. <br /> <br />Task C: Construction Specifications <br /> <br />1. Prepare a complete project specification (except for City's civil design portion) in Microsoft Word using <br />City "Boiler Plate" front-end specs and a sample of the technical provision provided on disk. Greenbook <br />Specifications will be utilized for the roadway, drainage and landscape improvements and Caltrans <br />Specifications will be utilized for traffic signal, signing and striping and loop replacements. <br /> <br />2. The Special Provisions and bid schedule will be in a format consistent with current City projects. <br /> <br />3. Specifications and Special Provisions will be written in City's preferred format, outlining how work is to be <br />done; what materials and equipment are to be used; what codes and specifications must be complied with; <br />what special conditions exist or may be encounrered which would effect work, a copy of all applicable standard <br />plans and any orner items which may require special attention in order to complete the rehabilitation as shown <br />on the plans. <br /> <br />Task D: Cost Estimate <br /> <br />Prepare an itemized construction quantity and cost estimate in an Excd spread sheet format, along wirn copies of <br />back up calculation sheets. Prepare preliminary cost estimates with each submittal and final COSt estimates when <br />plans are submitted for approval. <br /> <br />III Harris & Associates. <br /> <br />Bristol Corridor Widening - Phase I <br />Page-IS- <br />
The URL can be used to link to this page
Your browser does not support the video tag.