My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARRIS & ASSOCIATES 2 - 2006
Clerk
>
Contracts / Agreements
>
H
>
HARRIS & ASSOCIATES 2 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 11:28:56 AM
Creation date
8/15/2006 11:15:21 AM
Metadata
Fields
Template:
Contracts
Company Name
HARRIS & ASSOCIATES
Contract #
A-2006-192
Agency
PUBLIC WORKS
Council Approval Date
7/17/2006
Insurance Exp Date
8/1/2009
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <J <br /> <br />by the project. Ptepare and issue approptiate utility <br />Notifications shall consist of the following: <br /> <br />. It is our already performed the first utility notice, as parr of the original <br />mainline storm. drain in the project reach (Harris already has a copy), All of the existing utilities have <br />already been plotted on project base sheets and back checked by Harris & Associates as well as compared <br />to the electronic utility detection survey that has already been perform by Harris & Associates (see Exhibit 2, <br />elsewhere in this proposal). <br /> <br />. In expanded areas of work (for example down side street joins and at cul-de.sacs) Harris will confirm whether <br />the existing records extend far enough to cover these areas. Where they do not Harris & Associates will <br />coordinate the gathering of these additional records on a fast-track basis. <br /> <br />. Coordinate with the overhead utility line undergrounding efforts by SCE, AT&T, Adelphia CATV, MCI, SBC <br />and Pacific Bell, as applicable. <br /> <br />. Harris will send the "first" utility notice for this project and the preliminary plans to utilities based both on <br />City lists and a USA provided list, once the plans are far enough along ro reflect the proposed construction <br />improvements. All known preliminaty impacts would be highlighted on the plan sets. <br /> <br />. Set up and run a utility coordination meeting with City staff and all affected utility owners to put them on <br />notice as to the City's schedules and required timelines for the relocation efforts. A little extra "hand holding" <br />up from will go a long way toward the required coordination and cooperation with all of affected utility <br />owners. <br /> <br /> <br />a <br /> <br />,/ ~~uc.atJon 1St '" <br />?'. " <br />rjr;..' ".' ..'.~'..',.. <br />.Of " .,..' , .... <br /> <br />.. t;skH: Utility <br /> <br />. Monitor responses and relocation schedules provided by utility companies. <br /> <br />. Reflect all sutface and sub-surface utilities on the plans and in profiles whete applicable. <br /> <br />. Coordinate with utility companies regarding potholing, adjustments and/or relocations as a last resort where <br />unavoidable. Make recommendations for mitigating conflicts. <br /> <br />. A "pothole" map will be prepared, if needed, to identity where existing utilities come too close to the proposed <br />improvements and may possibly be in conflict. (Note that the amount of potholes required will be greatly <br />reduced, if not eliminated altogether, by OUt electronic utility detection survey. More likely a list will be <br />required of unavoidable utility conflicts requiring advanced utility company relocations, otherwise Harris' <br />proposed storm drain, wall and widening layouts will all be designed to avoid the existing utilities whenever <br />possible.) The requited utility potholes, if any, will be requested of the utility owners and as a last resort we will <br />utilize a contingency budget fot two days worth of utility po tho ling, established in OUt fees, once their location <br />and nwnber are bettet defined. <br /> <br />. It is assumed that the final utility notices will be issued by the City, on City letterhead, along with prints of the <br />approved plans, a tentative pre-construction meeting date and a tentative schedule for construction. Harris & <br />Associates will provide a "Utility Impact Summaty List" ro assist in this final submittal by City staff. <br /> <br />Phase IV: Bidding and Construction Assistance <br /> <br />During the bidding process Hatris will: <br />. Remain "on-call" to provide interpretation of the drawings and specifications as requested by City staff <br />. Attend the pre-construction meeting. <br /> <br />== I Harris & Associates. <br /> <br />Bristol Corridor Widening - Phase 1 <br />Page-17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.