My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GILLIS & ASSOCIATES 2
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2019
>
GILLIS & ASSOCIATES 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 12:46:29 PM
Creation date
9/8/2006 3:11:57 PM
Metadata
Fields
Template:
Contracts
Company Name
Gillis & Associates Architects, Inc
Contract #
A-2006-172
Agency
Public Works
Council Approval Date
7/3/2006
Insurance Exp Date
7/24/2012
Destruction Year
2019
Notes
Prof Liab exp 11/08/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surveyed and Reported existing conditions for work evaluation for the following <br />projects: <br />• Chicago Public Schools - ADA Survey for sixteen schools <br />Designed conceptual schemes, and layouts, Surveyed and evaluated scope of work, and Prepared <br />construction documents for the following projects: <br />• Lincoln Park Zoo, Education center — Interior & Exterior Renovations <br />• Chicago Park District, Independence Park — ADA Ramp & Entrance Modification <br />• Capital Development Board, University of Illinois at Chicago — ADA Elevator <br />INSTRUCTOR 1996 —1997 <br />Iowa State University, Ames, Iowa <br />Architecture 102 - Pre -Architecture Studio <br />• Taught Studio Class <br />• Graded Students' projects and assignments <br />APPRENTICE ARCHITECT / AUTOCAD SPECIALIST 1995 <br />Jorik Associates, Medinah, Illinois <br />• Computer hardware and software consultant <br />• Produced master AutoCAD file for construction documents <br />ARCHITECTURAL DESIGNER / AUTOCAD SPECIALIST 1987 —1994 <br />Managed new office facility project, Designed conceptual scheme, furniture systems, and layouts for the <br />following project: <br />• Irma Robinson, Inc., Chicago, Illinois — New Facility <br />Designed fixed furniture and interior finishes, Created Millwork detail drawings and <br />Completed interior finish schedule for the following project: <br />• West Side Technical Institute, Chicago, Illinois — New Facility <br />Designed and Calculated variables in accordance with programming, Developed construction documents, <br />Solved electrical layout in the field for the following project: <br />• O'Hare International Airport, Terminal 5, Chicago, Illinois - New Facility <br />Transferred construction documents into AuoCAD files for the following project: <br />• O'Hare International Airport, TWA Terminal, Chicago, Illinois <br />Surveyed and developed construction documents for the following project: <br />• Capital Development Board, University of Illinois at Chicago — Exterior Renovation <br />AWARDS: <br />Winner of the Townhouse Revisited Project sponsored by the Graham Foundation, Chicago, IL 1999 <br />Exhibited Works - Des Moines Art Center, Des Moines, IA 1996 <br />Exhibited Works - Convention, Des Moines, IA 1995 <br />Published Projects: CORE Student Journal of Architecture, Ames, IA, 1994 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.