Laserfiche WebLink
Municipal Engineering <br />Land Surveying <br />Infrastructure <br />James A. Sinnema, P.E. <br />Principal / Project Manager <br />Merit Civil Engineering, Inc. <br />EDUCATION <br />B.S., Civil Engineering, 1992, California State Polytechnic r <br />PROFESSIONAL DATA <br />Registered Civil Engineer, State of California (#552 , 1996) <br />EXPERIENCE OVERVIEW <br />, Pomona <br />Mr. Sinnema has over thirteen years of expe fence in preparation and design of street, storm drain and <br />sewer improvements and site development pans. His field experience includes pavement analysis and <br />general public works inspection. He is o skilled in sewer master plan preparation and updates <br />including modeling and cost distribution. <br />REPRESENTATIVE PROJECTS <br />La Veta Avenue Widenin , City of Orange, Department of Public Works. The project consisted of <br />preparing construction do uments for the widening of the roadway between Main and Batavia and <br />improvements to the offra p from the 22 Freeway. Plans included typical sections; street and storm <br />drain improvement plans nd profiles, construction details, drainage details, pavement delineation, <br />traffic control and desi cross sections. Responsible for managing staff and subconsultants and <br />processing the doc ents through Caltrans for approval of the proposed improvements to the <br />offram p. <br />• El Rodeo Sch I Site Improvements, Beverly Hills Unified School District. The project consisted of <br />coordinating 1with the project architect to prepare a precise grading plan for new hardscape <br />improvem Its at the entrance to the school. Included revising a portion of the area to be ADA <br />)building <br />ib . Responsible for design, management of staff and subconsultants and client coordination. <br />ache Warehouse, Los Angeles County Fire Department, Pacoima Yard. The project <br />e of preparing site improvement plans for a new warehouse on a vacant portion of the yard. <br />pr vements included precise grading/drainage and utility plans. Required utility relocation for <br />tilities that fell under the proposed building footprint. Due to the small area available for the <br />extensive retaining walls and complicated ADA accessibility design was required. <br />risible for design oversight, management of staff and coordination with subconsultants. <br />ux Family Care Clinic, County of Riverside, Economic Development Agency. Project <br />d the preparation of site improvement plans for a 3.5 acre site for a 20,000+ square foot <br />g and large parking lot. Required precise grading, storm drain, utility and erosion control plans. <br />Responsible for design oversight, managing staff and coordinating with utility companies and <br />coordinating with other design disciplines. <br />• Euclid Street Widening, City of Anaheim, Department of Public Works. The project consisted of <br />preparing construction documents for the widening of the roadway and bridge over the Carbon Creek <br />Channel north of Crescent Avenue. Plans included typical sections, plan and profiles, construction <br />details, pavement delineation, and design cross sections. Responsible for managing staff and <br />subconsultants and processing the documents through the Orange County Flood Control District. <br />