Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />f <br />! <br />~ <br /> <br />~H <br /> <br />Develop W orkflows to Support Data Maintenance <br />The following workflows shall be developed by the City: <br /> <br />· Workflow to maintain the street alias table used to dynamically segment the <br />pavement segments <br /> <br />. Workflow to maintain street centerlines table <br /> <br />The City shall prepare workflow documents that describe the steps and processes in these <br />workflows and provide these documents to Intergraph in Microsoft Word format. <br /> <br />Develop GeoMedia Transportation Manager Workflow <br /> <br />Intergraph shall develop a workflow that describes how pavement can be dynamically <br />created using the "DynSeg" function inside of GeoMedia Transportation Manager. This <br />shall be documented in Microsoft Word format. <br /> <br />Confirm Workflows <br /> <br />Joint Intergraph-City conference calls will be held to discuss the workflows and confirm <br />that the workflows address the requirements ofthe data model. The meetings will be <br />scheduled at appropriate times during the development of the data model and data <br />migration. One joint meeting will be for guiding the City on the data modeVworkflow <br />interaction. Two additional work sessions will be held as checkpoints for review and <br />feedback on the City's workflow development: The City shall finalize the workflow <br />document and provide to Intergraph for confirmation against the data model. Intergraph <br />will test the City Workflow Document and verify the data model against it. Intergraph <br />will provide feedback and the City shall adjust the workflows to match the data model. <br /> <br />Exit Criteria: City and Intergraph developed workflow documents are completed. <br /> <br />2.1.6 Testing and Preparation for Delivery <br /> <br />Intergraph will meet with the City one final time to show the current status of system and <br />get final confirmation. The meeting will be conducted using remote access tools such as <br />Interwise and conference call. <br /> <br />The Acceptance Test Plan (ATP) defines the testing methodology for the project that will <br />be the basis for the City's acceptance of the proj ect. The A TP will consist of the <br />workflows defined in the Workflow Development task. Intergraph will perform the final <br />test in Intergraph offices, using the criteria established in the ATP. <br /> <br />Once the testing is complete, Intergraph will perform final preparations delivering the <br />system to the City. <br /> <br /> <br />City of Santa Ana <br />Oracle Locator Geo.spatiaI Street Centerline Data Model with LRS <br /> <br />Page 10 of 39 <br /> <br />ij(b <br />