Laserfiche WebLink
<br />r <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />2.1.7 System Delivery and Site Acceptance Testing <br /> <br />The Intergraph Consultant will travel to the City's site for installation and acceptance <br />testing. The Intergraph Consultant and City representatives shall work together to install <br />the data repository and migrated data. Intergraph will deliver a CD or DVD with the Data <br />Dictionary and HTML versions of the Data Model. <br /> <br />Intergraph will perform a preliminary site test using the A TP. The City will assign a <br />subject matter expert to perform the Acceptance Test activities using the ATP. Intergraph <br />assumes that the City representative will have the authority to approve each item in the <br />test. Upon completion of acceptance testing, the City shall signoff on the project. <br /> <br />Deliverables: <br /> <br />· Repository of migrated data <br /> <br />· Site Acceptance Testing according to the Acceptance Test Plan <br /> <br />· System Acceptance and signoffby City and Intergraph <br /> <br />Exit Criteria: Completion of the SAT and signoffby City and Intergraph on the system. <br /> <br />2,1.8 Conduct Training <br /> <br />Intergraph shall deliver training following the system acceptance. Training shall be <br />conducted at City facilities with City-supplied equipment. Intergraph will conduct <br />informal, demonstration-style training. City configures equipment for training. Classes <br />are as follows: <br /> <br />. Oracle Locator with GeoMedia Applications <br /> <br />· GeoMedia Transportation Manager <br /> <br />Agendas for the training courses may be found in Appendix B. <br /> <br />Exit Criteria: Signoffby the City indicating completion of training. <br /> <br />22 Schedule <br /> <br />The project schedule provided below has an assumed start date. A mutually agreeable <br />start date will be developed upon successful contract award and the project schedule will <br />be adjusted accordingly. <br /> <br /> <br />City of Santa Ana <br />Oracle Locator Geo~patial Street Centerline Data Model with LRS <br /> <br />Page 11 of39 <br /> <br />~(p <br />