Laserfiche WebLink
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP <br />SECTION 3: ACKNOWLEDGEMENT OF REQUIRED TASKS <br />PROJECT TASKS <br />[I By checking this box, the Applicant Agency, on behalf of all the participating agencies, agree <br />to the following tasks: <br />Primary Implementation (PI) Phase, lasting approximately one year shall include the following: <br />Task 1: Project Management - PI Phase <br />This task is ongoing throughout the duration of the PI Phase of the project. It includes day-to-day <br />project management, such as meetings, progress reports, tracking of schedules, tracking of cost by <br />agency, invoicing, and overall administration of the PROJECT. <br />The following list is a minimum of what is required of this task: <br />• A running record of project cost broken down by Participating Agency shall be part of this task. <br />This information will be used by the Lead Agency to bill Participating Agencies for their respective <br />project match. <br />• A running record of all scope changes and/or any deviations from the final approved application. <br />This information will be used by the Lead Agency to request for Scope Changes at the Semi -Annual <br />Review (SAR). <br />Task 2: Data Collection and Field Review <br />All agencies on this application will opt out of the Data Collection portion of Task 2 due to participation <br />in the Countywide Baseline Project. A Before/After study will be completed. However, Data Collection <br />will be be conducted at the four (4) Caltrans intersections and utilized to develop Signal Timing <br />Optimization and Implementation. These efforts will be closely coordinated with the Countywide <br />Baseline Project. Cities of Brea, Anaheim and Orange are committed to excecuting a Cooperative <br />Agreeement with Caltrans for the Data Collection efforts. Funding for Data Collection at the Caltrans <br />intersection is included in the respective Agency Task 2. <br />This task shall include collecting seven-day, 24-hour machine counts, including vehicle and bike <br />classifications, along each 1-mile segment of the corridor(s). The project shall also produce weekday <br />and weekend peak period intersection turning movement (ITM) counts at every signalized <br />intersection, including pedestrian and bicycle counts. ITM counts shall be conducted for two hours of <br />each weekday peak period (AM, mid -day, and PM) and a single four-hour Saturday mid -day peak <br />period. All counts shall be summarized in Microsoft Excel format. All data shall adhere to the CTFP <br />Guidelines for data compatibility. <br />Data collection also includes field review of before and after conditions. The floating car method shall <br />be utilized with software and GPS for the 'Before' Study to fine-tune the corridor operation and verify <br />integrity of system intersection clocks. Synchronized Video shall be used to compare actual conditions <br />to anticipated conditions dictated by the time -space diagram so that any anomalies may be corrected <br />prior to the After' studies task. <br />Field review conducted as part of this task will document the existing conditions for all signal timing, <br />infrastructure, and system improvements on the project. This includes pre -construction pictures for <br />comparison during the post -construction walkthrough, should there be any questions or discrepancies <br />noted by any parties. Data Collection and Field Review Memos shall be provided to all participating <br />agencies. <br />F/I Check this box to indicate all agencies on this application will opt out of the data collection <br />portion of Task 2 due to participation in the Countywide Baseline Project. A Before/After study <br />is still required. A memorandum shall be submitted to indicate completion of this task. <br />