Laserfiche WebLink
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP <br />SECTION 3: ACKNOWLEDGEMENT OF REQUIRED TASKS <br />• All work performed for system construction and signal timing optimization <br />• Implementation schedule and improvements accomplished, including dates <br />• Procedures for continuing maintenance, surveillance, and evaluation of the coordinated signal <br />system <br />The report shall document all planned and programmed improvements on the study corridor as well <br />as recommendations based on PI tasks for further infrastructure improvements that would likely <br />improve the corridor signal coordination project results. The report shall be completed in accordance <br />with the current CTFP Guidelines. <br />Finally, the report shall provide recommendations with cost and benefit estimates for future <br />improvements to traffic signal infrastructure (signal controllers, vehicle detection, communications, <br />etc.), intersection capacity (appropriate signal phasing, lane geometrics, and alleviation of physical <br />bottlenecks that curtail arterial capacity), and traffic management strategies. These proposed <br />improvements should be useful in determining future enhancements to the corridor. <br />A Project Summary Sheet, one sheet front and back, that describes the project and improvements <br />gained shall be provided to OCTA. This sheet will be used by OCTA and Participating Agencies to <br />present to the Board and elected officials. <br />By checking this box, the following additional PI task(s) and/or exceptions will be made: <br />All agencies on this application will opt out of the Data Collection portion of Task 2 and Signal Timing <br />Optimization and Implementation portion of Task 4 due to participation in the Countywide Baseline <br />Project. However, Data Collection and Signal Timing Optimization and Implementation will be <br />conducted at the four (4) Caltrans intersections. These efforts will be closely coordinated with the <br />Countywide Baseline Project. Cities of Brea, Anaheim and Orange are committed to excecuting a <br />Cooperative Agreeement with Caltrans for the Data Collection and Signal Timing Optimization/ <br />Implementation efforts. A Before/After study will be completed for the entire corridor including the <br />Caltrans locations. No system construction is proposed at the Caltrans locations. Funding for Data <br />Collection and Signal Timing Optimization/ Implementation at the Caltrans intersection is included in <br />the respective Agency Task 2 and 4. <br />ONGOING OPERATIONS AND MAINTENANCE (O&M) PHASE, lasting approximately two (2) years, shall <br />include the following: <br />Task 6: Project Management - O&M Phase <br />This task includes day-to-day project management, such as meetings, tracking of schedules, <br />invoicing, and overall administration of the project. This task shall continue in full force as specified in <br />the Primary Implementation Phase. <br />Task 7: Continuing Support <br />During this 24-month period, the signal timing along the corridor/route/grid shall be observed and fine- <br />tuned. This task shall also include the monitoring, maintaining, and repair of detection and <br />communication implemented as part of this project. Monthly drives shall be conducted along the <br />length of the project during all designated corridor synchronization timing plan hours of operation in <br />order to verify that the synchronization timing is working as designed and complete any necessary <br />adjustments. This is followed by a monthly memorandum summarizing the status and trends of the <br />corridor based on the runs conducted. Trip logs for the month shall be provided to the Participating <br />Agencies. The memorandum shall include all additional tasks requested and completed during that <br />month. Performance metrics comparisons from ATSPM, where available, shall also be included in the <br />memorandum. <br />Task 8: Final O&M Report <br />