My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Cooperative Agreement with the Cities of Brea, Placentia, Anaheim, and Orange
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025
>
Item 18 - Cooperative Agreement with the Cities of Brea, Placentia, Anaheim, and Orange
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:36:39 PM
Creation date
3/26/2025 9:07:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/1/2025
Destruction Year
p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project P Regional Traffic Signal Synchronization Program <br />Table of Contents <br />Project P Supplemental Application Checklist <br />Page <br />RTSSP Online Application — submitted through OCFundTracker <br />a. Transportation Significance <br />b. Economic Effectiveness <br />c. Project Characteristics <br />Online <br />d. Project Scale <br />e. Number of Jurisdictions <br />f. Current Project Status <br />g. Funding Match <br />h. Cabinet photos, equipment specifications, as -built drawings, cabinet drawingsetc. <br />Online onl <br />Section 1: Key Technical Information <br />a. Name of Project Corridor/Grid/Route <br />1 <br />b. Project Limits <br />1 <br />c. Project Length <br />1 <br />d. Number of Signalized Intersections Along Corridor <br />1 <br />e. Participating Agencies/Traffic Forum Members <br />1 <br />f. Lead Agency <br />1 <br />g. Designation of the corridor to synchronize <br />1 <br />h. Project Start and End Date <br />1 <br />i. Previous funding <br />1 <br />j. Contact Information <br />1 <br />k. Signalized intersections that are part of the project <br />2 <br />I. Offset signalized intersections that are part of the project <br />2 <br />m. Project Map Depicting the Project Limits <br />3 <br />Section 2: Regional Significance <br />4 <br />Section 3: Acknowledgement of Required Tasks <br />5-8 <br />Section 4: Funding Needs/Costs for Proposed Project by Task <br />a. Summary of Project Cost <br />9 <br />b. Summary of Cost by Agency <br />10-11 <br />c. Summary of Intersection Improvement Costs <br />12-13 <br />Section 5: Detailed Local Match Commitment <br />14 <br />Section 6: Project Schedule by Task <br />a. Project Start and End Dates <br />15 <br />b. Project Schedule by Task <br />15 <br />Appendices <br />A. Calculations and Estimated Points <br />B. Agency Improvement Calculations <br />C. Vehicle Miles Traveled (VMT) <br />D. Agency Resolutions and Letters of Support <br />E. Cabinet Photos and As -built drawings (Uploaded to OCFundTracker and included in Electronic <br />Submittal Only) <br />
The URL can be used to link to this page
Your browser does not support the video tag.