My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Cooperative Agreement with the Cities of Brea, Placentia, Anaheim, and Orange
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025
>
Item 18 - Cooperative Agreement with the Cities of Brea, Placentia, Anaheim, and Orange
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:36:39 PM
Creation date
3/26/2025 9:07:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/1/2025
Destruction Year
p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1: KEY TECHNICAL INFORMATION <br />Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP <br />a. Project Corridor <br />Kraemer Boulevard/ Glassell Street/ Grand Avenue Corridor <br />b. Project Limits: <br />from Lambert Road to Dyer Road <br />c. Project Length (miles): <br />15.14 <br />d. Number of signalized intersections along the corridor (include all Caltrans intersections): <br />61 number of signals on project corridor(s) 3 number of offset signals included <br />in this project <br />e. Participating agencies / Traffic Forum Members (including applicant agency): <br />❑ San Juan Capistrano <br />❑ Aliso Viejo ❑ Cypress ❑ La Habra ❑ Los Alamitos <br />Q Santa Ana <br />Q Anaheim ❑ Dana Point ❑ La Palma ❑ Mission Viejo <br />❑ Seal Beach <br />❑� Brea ❑ Fountain Valley ❑ Laguna Beach ❑ Newport Beach <br />❑ Stanton <br />❑ Buena Park ❑ Fullerton ❑ Laguna Hills ❑✓ Orange <br />❑ Tustin <br />❑✓ Caltrans ❑ Garden Grove ❑ Laguna Niguel ❑✓ Placentia <br />❑ Villa Park <br />❑ Costa Mesa ❑ Huntington Beach ❑ Laguna Woods ❑ Rancho Santa Margarita <br />❑ Westminster <br />❑ County of Orange ❑ Irvine ❑ Lake Forest ❑ San Clemente <br />❑ Yorba Linda <br />f. Lead Agency <br />Santa Ana <br />g. Designation of the corridor to synchronize: <br />C Signal Synchronization Network Corridor / Priority Corridor Master Plan of Arterial Highways Corridor <br />h. Project Start Date: January 1, 2025 Project End Date: December 31, 2027 <br />i. Select any that apply: <br />Re -timing at least 75% of previous project ❑ Timing at least 75% of new eligible project <br />JI None <br />J All participating agencies are participating in the Countywide Baseline Project <br />j. Contact Information (Include name, title, agency, phone, email, and address) <br />Cesar Rodriguez, Senior Civil Engineer <br />Albert Espinoza, City Engineer <br />City of Santa Ana, 714-647-5626 <br />City of Brea, 714-990-7657 <br />crodriguez5@santa-ana.org <br />alberte@ci.brea.ca.us <br />20 Civic Center Plaza <br />1 Civic Center Circle <br />Santa Ana, CA 92701 <br />Brea, CA 92821 <br />Kyra Tao, Transportation Manager <br />John Thai, Principal Traffic Engineer <br />City of Placentia, 714-993-8121 <br />City of Anaheim, 714-765-5294 <br />ktao@placentia.org <br />jthai@anaheim.net <br />401 E. Chapman Ave. <br />200 S. Anaheim Blvd, Suite 276 <br />Placentia, CA 92870 <br />Anaheim, CA 92805 <br />Gabrielle Hayes, Senior Civil Engineer <br />Pauline Nguyen, Branch Chief, Traffic Signals/Ramp <br />City of Orange, 714-744-5561 <br />Metering/ <br />ghayes@cityoforange.org <br />Census Caltrans District 12, 949-279-9168 <br />300 E. Chapman Avenue <br />6681 Marine Way <br />Orange, CA 92866 <br />Irvine, CA 92618 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.